Laserfiche WebLink
ARROYO LAGO RESIDENTIAL PROJECT <br /> ADDENDUM <br /> <br /> <br />114 FCS <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480036/Addendum/21480036 Arroyo Lago Residential Project Addendum.docx <br />f) Destruction of Paleontological Resource or Unique Geologic Feature <br />Would the project: Directly or indirectly destroy a unique paleontological resource or <br />site or unique geologic feature? <br />Prior FEIR Conclusions <br />The Prior FEIR found that the project site is underlain by Holocene- and Pleistocene-age deposits. <br />While Holocene deposits have low potential for paleontological resources, deeper Pleistocene layers <br />have high potential. The University of California Museum of Paleontology (UCMP) database identified <br />five vertebrate fossil localities within 3 miles of the project site. Therefore, given the foregoing, and <br />the possibility of inadvertent discovery during construction, the Prior FEIR concluded there would be a <br />potentially significant impact and identified MM GEO-6, which requires a qualified Paleontologist to <br />conduct WEAP training, monitor excavations deeper than 6 feet, and implement fossil salvage <br />procedures if resources are encountered. The Prior FEIR concluded that impacts would be less than <br />significant with mitigation incorporated. (Draft EIR, pp. 3.6-22, 6-14). <br />Proposed Project Analysis and Conclusion <br />Consistent with the impact conclusions set forth in the Prior FEIR for the County Project, the <br />proposed project would have a potentially significant impact in this regard due to potential inadvertent <br />discovery and, thus, would be required to implement MM GEO-6, which would ensure that potential <br />impacts related to any unique paleontological resources and unique geologic features would be less <br />than significant. Therefore, the proposed project would not introduce new significant impacts or create <br />substantially more severe significant impacts than those previously identified in the Prior FEIR. No <br />additional analysis is required. <br />Zone 7 Stormwater Option <br />The Zone 7 Stormwater Option would not result in any new or more severe impacts related to <br />geology, seismicity, or soils because it was described and considered in the Prior FEIR. By <br />eliminating construction of the detention basin, pump facilities, and storm drain force main (as <br />contemplated in the City Stormwater Option), this option would incrementally reduce grading and soil <br />disturbance and would not increase exposure to seismic hazards, erosion, liquefaction, expansive <br />soils, or other geologic risks. In addition, reduced subsurface disturbance would lessen the potential <br />to encounter paleontological resources, and all previously adopted inadvertent discovery procedures <br />would continue to apply; therefore, impacts would remain less than significant and consistent with the <br />Prior FEIR. <br />Mitigation Measures <br />MM GEO-1 Design-Level Geotechnical Study <br />Prior to issuance of building and grading permits, an updated design-level <br />geotechnical exploration and assessment shall be performed by a qualified