Laserfiche WebLink
ARROYO LAGO RESIDENTIAL PROJECT <br />ADDENDUM <br /> <br /> <br />FCS 115 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480036/Addendum/21480036 Arroyo Lago Residential Project Addendum.docx <br />Geotechnical Engineer. The design-level exploration and reporting shall include (but <br />would not be limited to) the following items: <br />• Hollow-stem auger borings, including matched-pair borings. <br />• Soil sample collection at depths relevant to building-specific foundation design. <br />• Laboratory testing, including (but not limited to) moisture content, unit weight, <br />gradation, Atterberg Limits, strength, consolidation, and corrosivity testing. <br />• Design-level assessment of geologic and geotechnical hazards, including (but not <br />limited to) the following: <br />- Characterization of subsurface conditions. <br />- Consolidation of compressible soil based on in situ structural loading. <br />• Design recommendations for foundation system design. <br />• Design-level subexcavation, ground improvement, and/or surcharging <br />recommendations. <br />• Foundation constructability recommendations. <br />• Design-level earthwork and improvement design and construction <br />recommendations. <br />• Design-level features required for landslides. <br />The recommendations included in the Design-level Geotechnical Report shall be <br />implemented during construction activities, including grading and excavation. <br />MM GEO-1 has been partially satisfied via the preparation of a Design-level Geotechnical Report <br />prepared by ENGEO and included herein. In accordance with the analysis, and to demonstrate full <br />compliance with MM GEO-1, prior to the issuance of building and grading permits, the applicant shall <br />incorporate the recommendations included in the Design-level Geotechnical Report in all application <br />materials and plan check submittals and shall thereafter implement the same during project <br />construction. <br />MM GEO-6 Prior to the start of any ground-disturbing activity, a qualified Paleontologist meeting <br />Society of Vertebrate Paleontology (SVP) standards and best practices shall be <br />retained to prepare and conduct a project-wide Worker Environmental Awareness <br />Program (WEAP) training. The WEAP shall contain unanticipated discovery <br />measures to be followed in the event that paleontological resources are encountered <br />while the qualified Paleontologist or qualified Paleontological Monitor is not present <br />(i.e., during excavations within the first 6 feet below the existing grade). The WEAP <br />shall be conducted by a qualified environmental trainer, under the supervision of a <br />qualified Paleontologist. In the event construction crews are phased in, additional <br />training shall be conducted for new construction personnel. The training session shall <br />focus on the recognition of the types of paleontological resources that could be <br />encountered within the proposed project site and the procedures to be followed if <br />they are found.