Laserfiche WebLink
ARROYO LAGO RESIDENTIAL PROJECT <br /> ADDENDUM <br /> <br /> <br />126 FCS <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480036/Addendum/21480036 Arroyo Lago Residential Project Addendum.docx <br />as fuels, lubricants, and household cleaners. Consistent with the analysis in the Prior FEIR, <br />compliance with applicable federal, State, and local laws and regulations regarding hazardous <br />materials, including the Hazardous Materials Transportation Act, California Public Resources Code, <br />and the City’s General Plan (including Public Safety Element Policy 17, which seeks to “ensure that <br />hazardous materials are not released as a result of construction activities and that any existing <br />hazardous materials and potential contamination are remediated prior to development”), would <br />reduce and limit any such potential associated risks, and impacts in this regard would be less than <br />significant, consistent with the impact conclusions of the Prior FEIR. Therefore, the proposed project <br />would not introduce new significant impacts or create substantially more severe significant impacts <br />than those previously identified in the Prior FEIR. No additional analysis is required. <br />b) Risk of Upset <br />Would the project: Create a significant hazard to the public or the environment through <br />reasonably foreseeable upset and accident conditions involving the <br />release of hazardous materials into the environment? <br />Prior FEIR Conclusions <br />Phase I Environmental Site Assessments (Phase I ESAs) were conducted for both the residential site <br />and off-site improvement areas, and no Recognized Environmental Conditions (RECs) were <br />identified. The Former Hanson Aggregate Radum Facility is classified as a Controlled REC (CREC), <br />but nearby sites were evaluated and found not to pose a concern to the project site. The Prior FEIR <br />found that, because the project site remains under active regulatory oversight with long-term <br />management requirements, there is potential for exposure to impacted soil or groundwater if such <br />materials are not properly handled. However, the County Project would be required to comply with the <br />ACDEH-approved Soil Management Plan and Soil Import Management Plan, which establishes <br />procedures for identifying, segregating, testing, and properly managing any impacted materials <br />encountered during construction, which would ensure potential hazards to the project site and to the <br />public are minimized. Additionally, vapor migration was also assessed and determined to be unlikely. <br />Areas of Concern (AOCs) 6 and 7 were evaluated through historical investigations and subsequent <br />sampling; results indicated that subsurface conditions in both areas do not pose a risk to human <br />health or the environment. None of the County Project’s on-site or off-site improvements would be <br />constructed within these AOCs. <br />The County Project would comply with applicable health and safety laws and regulations to prevent <br />accidental releases. As discussed above, construction activities would require the use of <br />commercially available typical hazardous materials and may generate small amounts of hazardous <br />waste. <br />The Prior FEIR disclosed that the use, storage, transportation, and disposal of hazardous materials at <br />the project site could result in the accidental release of hazardous materials into the environment. <br />However, the County Project would be required to comply with applicable mandatory federal, State, <br />and local laws and regulations, which would reduce the potential for an accidental release of <br />hazardous materials. In the event of an accidental release, the ACFD and ACDEH would be notified