Laserfiche WebLink
ARROYO LAGO RESIDENTIAL PROJECT <br />ADDENDUM <br /> <br /> <br />FCS 141 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480036/Addendum/21480036 Arroyo Lago Residential Project Addendum.docx <br />The proposed project stormwater drainage system, including the bioretention area and detention <br />basin, would have sufficient capacity to serve the proposed project. The stormwater system would be <br />designed in accordance with all applicable standards, including those set out in Pleasanton Municipal <br />Code Chapter 9.14 (“Stormwater Management and Discharge Control”) with adequate capacity to <br />accommodate the project site during storm events and ensure no net increase in off-site flow of <br />stormwater. Consistent with Pleasanton General Plan Public Safety Policy 15, residential <br />development would be located outside of the 100-year flood hazard area, while limited off-site utility <br />infrastructure proposed within Flood Hazard Zone A would be designed to meet applicable FEMA and <br />local flood control standards. In addition, the proposed project includes a controlled overland release <br />in the form of an emergency spillway to safely convey extreme storm flows in accordance with Zone 7 <br />Flood Control standards and historic drainage patterns. <br />Moreover, the proposed project includes residential land uses, which do not represent the type of use <br />that would otherwise degrade water quality (e.g., industrial land uses that utilize hazardous materials <br />that could adversely affect water quality). Anticipated and potential pollutants generated by the <br />proposed project would be limited to household items and normal and expected materials for the <br />proposed land uses and include sediment, nutrients, pesticides, metals, pathogens, oil, and grease. <br />These materials would be limited to personal use quantities. Thus, impacts would be less than <br />significant, consistent with the impact conclusions of the Prior FEIR. <br />Therefore, the proposed project would not introduce new significant impacts or create substantially <br />more severe significant impacts than those previously identified in the Prior FEIR. No additional <br />analysis is required. <br />e) Water Quality Control or Sustainable Groundwater Management Plans Consistency <br />Would the project: Conflict with or obstruct implementation of a water quality control <br />plan or sustainable groundwater management plan? <br />Prior FEIR Conclusions <br />Particularly given the project site’s location and the scope of off-site utility improvements, the Prior <br />FEIR conducted a robust analysis to consider whether the County Project would conflict with or <br />obstruct implementation of a water quality control plan or sustainable groundwater management plan. <br />As detailed more fully therein, the Prior FEIR confirmed that the County Project would comply with the <br />RWQCB Basin Plan and Zone 7’s Alternative GSP. During construction, the County Project would be <br />required to comply with the terms of the Construction General Permit, which requires the preparation <br />and implementation of a SWPPP that includes BMPs to ensure reduction of pollutants from <br />construction activities potentially entering surface waters. <br />During operation, the County Project would be served by Cal Water Livermore District, which derives <br />its water supply from a combination of groundwater and surface water purchased from Zone 7. The <br />County Project complies with the Zone 7 Alternative GSP by demonstrating that its groundwater use <br />would have an insignificant impact on basin conditions and would not interfere with Zone 7’s ability to <br />maintain the Livermore Valley Groundwater Basin within its sustainable yield. The Prior FEIR