My WebLink
|
Help
|
About
|
Sign Out
PC-2026-15
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2026
>
PC-2026-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2026 12:52:06 PM
Creation date
8/5/2026 12:48:39 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/24/2026
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ARROYO LAGO RESIDENTIAL PROJECT <br />ADDENDUM <br /> <br /> <br />FCS 161 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480036/Addendum/21480036 Arroyo Lago Residential Project Addendum.docx <br />b) Displacement of Persons or Housing <br />Would the project: Displace substantial numbers of existing people or housing, <br />necessitating the construction of replacement housing elsewhere? <br />Prior FEIR Conclusions <br />The Prior FEIR found that the project site is currently vacant, and there are no existing housing units <br />or permanent residents on the project site. As such, development of the County Project would not <br />result in the displacement of existing residents or housing or necessitate the construction of <br />replacement housing elsewhere. Therefore, the Prior FEIR concluded that there would be no impact. <br />(Draft EIR, pp. 3.13-12, 6-18). <br />Proposed Project Analysis and Conclusion <br />As the project site for the proposed project remains the same project site as the County Project, the <br />project site does not contain existing housing or residents. As such, consistent with the Prior FEIR’s <br />impact conclusion, the proposed project would not displace existing residents or housing, <br />necessitating the construction of replacement housing, and no impact would occur. Therefore, the <br />proposed project would not introduce new significant impacts or create substantially more severe <br />significant impacts than those previously identified in the Prior FEIR. No additional analysis is <br />required. <br />Zone 7 Stormwater Option <br />Because the Zone 7 Stormwater Option is limited to a modification in stormwater management <br />infrastructure and does not alter the proposed project’s residential development program, it would <br />have no impact with respect to population or housing. <br />Mitigation Measures <br />None. <br />Conclusion <br />There is no new information of substantial importance, changes in the project, or changes in <br />circumstances under which it will be undertaken, identifying new significant effects, nor is there a <br />substantial increase in the severity of previously identified significant impacts related to population <br />and housing. The conclusions from the Prior FEIR remain unchanged when considering the <br />implementation of the proposed project. No further environmental review is required.
The URL can be used to link to this page
Your browser does not support the video tag.