My WebLink
|
Help
|
About
|
Sign Out
PC-2026-15
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2026
>
PC-2026-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2026 12:52:06 PM
Creation date
8/5/2026 12:48:39 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/24/2026
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ARROYO LAGO RESIDENTIAL PROJECT <br />ADDENDUM <br /> <br /> <br />FCS 171 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480036/Addendum/21480036 Arroyo Lago Residential Project Addendum.docx <br />Prior FEIR Conclusions <br />The Prior FEIR evaluated the addition of up to approximately 691 new residents,49 potentially <br />increasing demand for recreational facilities as compared to existing conditions. However, the County <br />Project would include a centrally located approximately 0.7-acre private park and approximately 0.5 <br />mile of multiuse trails, designed to serve both new residents and the surrounding community, thereby <br />reducing pressure on existing public parks. These amenities are integrated into the project design <br />and would be constructed on-site, eliminating the need for new or expanded off-site recreational <br />facilities, the impacts of which were fully evaluated in the relevant environmental topic areas <br />throughout the Prior FEIR. <br />The County Project would be subject to applicable development impact fees per Alameda County <br />requirements, which would further support maintenance and improvements to existing and planned <br />facilities. Additionally, the Prior FEIR determined that both the County and the City currently exceed <br />their park service standards of 5 acres of parkland per 1,000 residents. Therefore, the Prior FEIR <br />concluded that impacts would be less than significant. (Draft EIR, pp. 3.15-7 -3.15-9, 6-20). <br />Proposed Project Analysis and Conclusion <br />Residents of the proposed project during operation would have access to local parkland operated by <br />the City, as well as nearby regional parkland operated by the East Bay Regional Parks District <br />(EBRPD). As described in the Prior FEIR, the EBRPD and the City each have a target park service <br />standard of at least 5 acres of parkland per 1,000 residents. The EBRPD currently provides <br />approximately 109 acres of parkland per 1,000 residents, while the City provides approximately 5.09 <br />acres per 1,000 residents.50,51,52 As the EBRPD and the City both currently exceed their target park <br />service standards, the estimated 588 new residents 53 that would result from the proposed project <br />would not be enough to trigger an increase in use of these existing facilities such that substantial <br />physical deterioration of such facilities would occur or be accelerated. <br />Additionally, consistent with the County Project, the proposed project would include an approximately <br />0.7-acre private park with a Public Access Easement, as well as approximately 0.5 acre of multiuse <br />trails, the construction of which would be subject to relevant local policies and regulations; as <br />discussed above, the potential environmental impacts of these recreational amenities were fully <br />evaluated in the relevant environmental topic areas throughout the Prior FEIR. <br /> <br />49 (194 units + 49 junior ADUs) * 2.84 (County’s average persons per household) = approximately 691 persons <br />50 East Bay Regional Park District (EBRPD). 2026. About Us. Website: https://www.ebparks.org/about-us. Accessed March <br />10, 2026. <br />51 California Department of Finance (DOF). 2025. E-5 Population and Housing Estimates for Cities, Counties, and the <br />State, 2020-2025. Website: https://dof.ca.gov/Forecasting/Demographics/Estimates/e-5-population-and-housing- <br />estimates-for-cities-counties-and-the-state-2020-2025/. Accessed March 10, 2026. <br />52 City of Pleasanton. 2022. Program Environmental Impact Report City of Pleasanton 2023-2031 (6th Cycle) Housing <br />Element Update. Website: https://files.ceqanet.lci.ca.gov/277712-3/attachment/-bwD- <br />NIbsCtS27yQFn3dCFDFxvAATXvXAuUCWntLOWyyE9xYwOCV3-nixSHdoCaK6829Yoe_cKtAK_Xs0. Accessed March <br />10, 2026. <br />53 (189 units + 48 junior ADUs) * 2.48 (City’s average persons per household) = approximately 588 persons
The URL can be used to link to this page
Your browser does not support the video tag.