My WebLink
|
Help
|
About
|
Sign Out
PC-2026-15
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2026
>
PC-2026-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2026 12:52:06 PM
Creation date
8/5/2026 12:48:39 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/24/2026
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ARROYO LAGO RESIDENTIAL PROJECT <br /> ADDENDUM <br /> <br /> <br />176 FCS <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480036/Addendum/21480036 Arroyo Lago Residential Project Addendum.docx <br />In summary, consistent with the Prior FEIR’s impact conclusions, the proposed project would not <br />conflict with any plans or policies for transportation facilities and would provide adequate on-site <br />pedestrian and bicycle facilities. Therefore, impacts would be less than significant. Thus, the <br />proposed project would not introduce new significant impacts or create substantially more severe <br />significant impacts than those previously identified in the Prior FEIR. No additional analysis is <br />required. <br />b) Inconsistent with CEQA Guidelines Section 15064.3, subdivision (b) <br />Would the project: Would the project conflict or be inconsistent with CEQA Guidelines <br />Section 15064.3, subdivision (b)? <br />Prior FEIR Conclusions <br />The Prior FEIR determined that the average daily VMT for residents of the East Planning Area of <br />Alameda County is 30.5 miles per capita. The associated VMT threshold is 15 percent below the <br />County average, i.e., 25.9 VMT. The Prior FEIR determined that the County Project would generate <br />29.9 VMT per capita, exceeding the threshold of 25.9 VMT per capita for the East Planning Area of <br />Alameda County. The Prior FEIR determined that a 13.4 percent reduction in VMT would be required <br />for the County Project to achieve compliance with the County’s VMT threshold. <br />The County Project incorporates several Transportation Demand Management (TDM) measures, <br />including: <br />• 25 percent deed-restricted junior ADUs, contributing an approximately 0.4–1.2 percent VMT <br />reduction. <br />• Traffic calming features on all project streets (1 percent reduction), which was required as MM <br />TRANS-2. <br />• 1,000 feet of off-site sidewalk and bicycle lane improvements (0.5 percent reduction). <br />These reduction values are derived from the County’s TDM/VMT Reduction program and together <br />would provide a maximum reduction of 2.7 percent, which would be insufficient to meet the required <br />13.4 percent reduction. The project site’s distance from transit and lack of full-time employment limits <br />the applicability of other TDMs. <br />Similarly, for Alternative 2, the Prior FEIR determined that VMT per resident would remain above the <br />City’s significance threshold of 25.9, resulting in a significant and unavoidable impact. Therefore, the <br />Prior FEIR concluded that impacts would be significant and unavoidable. (Draft EIR, pp. 3.16-22, 6- <br />20–6-21; FEIR, p. 5-1). <br />Proposed Project Analysis and Conclusion <br />Fehr & Peers prepared a VMT Assessment for the proposed project (Appendix D), dated March 9, <br />2026. The VMT Assessment uses a Countywide average VMT (19.4 miles per capita) as its baseline <br />rather than the Prior FEIR’s use of average VMT for the East Planning Area of Alameda County (30.5
The URL can be used to link to this page
Your browser does not support the video tag.