My WebLink
|
Help
|
About
|
Sign Out
PC-2026-15
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2026
>
PC-2026-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2026 12:52:06 PM
Creation date
8/5/2026 12:48:39 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/24/2026
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ARROYO LAGO RESIDENTIAL PROJECT <br />ADDENDUM <br /> <br /> <br />FCS 179 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480036/Addendum/21480036 Arroyo Lago Residential Project Addendum.docx <br />sight distance and turning movements at intersections were evaluated and found to meet Caltrans <br />standards. No deficiencies were identified that would impede emergency response. Therefore, the <br />Prior FEIR concluded that impacts would be less than significant. (Draft EIR, pp. 3.16-29, 6-20, 6-21). <br />Proposed Project Analysis and Conclusion <br />Consistent with the analysis in the Prior FEIR, emergency access to the project site would be <br />provided via two different access routes via Busch Road from Valley Avenue, and emergency vehicles <br />would enter the project site through the western project driveway along Busch Road. The proposed <br />project does not propose any permanent lane closures or obstructions that could impede emergency <br />response to or from the project site from the surrounding streets. <br />The proposed project provides adequate internal circulation and emergency access, with all proposed <br />roadways and access points designed to meet applicable City and fire department standards for <br />emergency vehicles. Emergency response to and from the project site would also be supported by <br />the surrounding arterial roadway network, including El Charro Road. The applicant would financially <br />contribute to any identified improvements to El Charro Road to ensure it operates in accordance with <br />emergency access standards. The proposed project would not obstruct or alter any major roadways <br />that may serve as evacuation routes, such as Stanley Boulevard or I-680, and any temporary <br />construction-related road closures would be minor and short-term. Furthermore, the proposed project <br />would be reviewed by the LPFD to ensure compliance with all emergency access requirements. <br />As the proposed circulation network and street design would be substantially the same as the County <br />Project, sight distance and turning movements at intersections would meet applicable City standards <br />under the proposed project. Therefore, the proposed project would not introduce new significant <br />impacts or create substantially more severe significant impacts than those previously identified in the <br />Prior FEIR. No additional analysis is required. <br />Zone 7 Stormwater Option <br />The Zone 7 Stormwater Option is limited to a modification of stormwater management infrastructure <br />and would not change the number of residential units, trip generation, roadway access points, or <br />circulation patterns evaluated for the proposed project. By eliminating construction of the detention <br />basin, pump facilities, and storm drain force main (as contemplated by the City Stormwater Option), <br />this option would incrementally reduce construction-related vehicle trips and equipment hauling, while <br />long-term operational traffic conditions would remain unchanged. Accordingly, consistent with the <br />impact conclusions in the Prior FEIR, traffic impacts would remain less than significant and consistent <br />with the conclusions of the Prior FEIR. <br />Mitigation Measures <br />MM TRANS-2 Prior to project operation, the proposed project would implement traffic calming <br />elements on all of the street improvements included in the proposed project.
The URL can be used to link to this page
Your browser does not support the video tag.