Laserfiche WebLink
ARROYO LAGO RESIDENTIAL PROJECT <br /> ADDENDUM <br /> <br /> <br />184 FCS <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480036/Addendum/21480036 Arroyo Lago Residential Project Addendum.docx <br />service pressures would remain above the City’s minimum standards and that required fire flows <br />could be met while maintaining acceptable pressures and pipeline velocities. Additionally, the <br />proposed improvements would not result in pump station impacts and would not require additional <br />off-site water system improvements beyond those identified as part of the proposed project and the <br />shared East Pleasanton pipeline connection. These findings are consistent with the City’s Water <br />Distribution System Capacity Master Plan which establishes systemwide criteria for water supply, <br />distribution, and fire flow performance. Accordingly, the City has adequate water distribution capacity <br />to serve the proposed project, and the proposed project would not require construction of new or <br />expanded water supply, storage, or distribution facilities beyond those already planned and <br />evaluated. Thus, as described in Impact UTIL-b, the City would have adequate water supplies <br />available to accommodate the proposed project. <br />Wastewater <br />Wastewater services would be provided to the proposed project by the City. The City owns and <br />operates sanitary sewer lines and conveys wastewater throughout the City to the DSRSD regional <br />WWTP. Through a contract agreement with the City, DSRSD provides wastewater treatment services <br />to the City. <br />The proposed project would include a connection to an existing off-site 8-inch diameter sewer line on <br />Mohr Avenue, northwest of the project site. Similar to the proposed water and stormwater lines <br />contemplated in the County Project, the proposed project would construct a new 8-inch diameter <br />sewer line extending from the northwest corner of the project site, following the existing utility road, to <br />Mohr Avenue to access the existing sewer line (Exhibit 9c). Sanitary sewer service throughout the <br />project site would be provided in 8-inch diameter sanitary sewer lines under the proposed internal <br />streets. <br />With respect to wastewater conveyance capacity, the City commissioned a Technical Memorandum <br />by Woodard & Curran (dated November 12, 2025, included as Appendix E), to evaluate the existing <br />network under several scenarios, including the addition of four future planned projects, and to identify <br />improvements that could be funded by future development thus ensuring adequate capacity of <br />downstream sewer lines exist to accommodate planned growth. The four projects evaluated in the <br />Technical Memorandum include: Villages at the Quarry (Kiewit); Arroyo Lago; East Lakes; and <br />Amazon. <br />The Technical Memorandum identifies several Capital Improvement Program (CIP) strategies and <br />associated pro rata costs to be assumed by the proposed project and future development to ensure <br />adequacy of the system to accommodate future flows under dry and wet weather scenarios. The <br />proposed project would include construction of needed downstream sewer improvements according <br />to the Technical Memorandum and would seek reimbursement as appropriate from future <br />development according to the pro rata share methodology. The proposed project would also <br />contribute funding for future water and wastewater infrastructure through payment of applicable City <br />development impact fees, which are intended to support planned facilities operated by DSRSD.