Laserfiche WebLink
ARROYO LAGO RESIDENTIAL PROJECT <br /> ADDENDUM <br /> <br /> <br />186 FCS <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480036/Addendum/21480036 Arroyo Lago Residential Project Addendum.docx <br />proposed project would be served by existing utility lines on the north side of the project site and <br />along Busch Road. Both power lines are currently located above ground but would be moved <br />underground as part of the proposed project. As such, the proposed project would not require <br />relocation or construction of new or expanded electric power, natural gas, or telecommunications <br />facilities beyond what is proposed under the proposed project. <br />Conclusion <br />In summary, consistent with the impact conclusions in the Prior FEIR, impacts related to the need for <br />relocation or construction of new or expanded water, wastewater treatment, stormwater drainage, <br />electric power, natural gas, or telecommunications facilities would be less than significant. Therefore, <br />the proposed project would not introduce new significant impacts or create substantially more severe <br />significant impacts than those previously identified in the Prior FEIR. No additional analysis is <br />required. <br />b) Water Supply <br />Would the project: Have sufficient water supplies available to serve the project and <br />reasonably foreseeable future development during normal, dry and <br />multiple dry years? <br />Prior FEIR Conclusions <br />The Prior FEIR found that the County Project would receive water supply from Cal Water through its <br />Livermore District. Approximately 70 percent of the Livermore District’s water is purchased from Zone <br />7, with the remaining 30 percent coming from groundwater. The Livermore District 2020 UWMP <br />concluded that Zone 7 could meet all its obligations to provide adequate water supplies for the <br />Livermore District on average in normal year, single dry year, and multiple dry years.58 The County <br />Project would construct approximately 400,000 gallons of water storage, including 360,000 gallons <br />intended for fire use and 20,046 gallons intended for emergency water storage. Further, based on the <br />Livermore District UWMP, it was found that it would be able to fully serve its service area (existing and <br />future users), including the County Project, in normal, single dry, and all multi-year drought scenarios. <br />The project-specific Water Supply Evaluation (WSE) determined that there would be adequate water <br />supplies to meet the demands of the County Project in normal, single dry, and multiple dry years <br />through 2045. Therefore, the Prior FEIR concluded that impacts would be less than significant. (Draft <br />EIR, pp. 3.17-1, 6-22–6.24). <br />Proposed Project Analysis and Conclusion <br />Rather than being served potable water by Cal Water through its Livermore District, water supply <br />would be provided to the project site by the City. The City receives 100 percent of its water from Zone <br />7.59 While the City previously obtained a portion of its supply from City-owned groundwater wells, <br />those wells are no longer in operation. The City is actively evaluating future supply alternatives, <br /> <br />58 California Water Service (Cal Water). 2021. 2020 Urban Water Management Plan. June. <br />59 City of Pleasanton. 2026. About our Water. Website: https://www.cityofpleasantonca.gov/our-government/pleasanton- <br />water/about-our-water/. Accessed March 10, 2026.