Laserfiche WebLink
ARROYO LAGO RESIDENTIAL PROJECT <br />ADDENDUM <br /> <br /> <br />FCS 187 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480036/Addendum/21480036 Arroyo Lago Residential Project Addendum.docx <br />including potential joint groundwater wells in coordination with Zone 7; however, at present, all water <br />supplies are purchased from Zone 7.The Zone 7 2020 UWMP indicates that the district can meet <br />retailer demands through normal, single dry, and multiple dry years.60 The proposed project would <br />include construction of 189 single-family residential units and 48 junior ADUs, which would trigger <br />substantially the same demand to that evaluated in the WSE, which analyzed 194 single-family <br />residential units and 49 junior ADUs. The proposed project would have an estimated water demand of <br />approximately 43 acre-feet per year (AFY), which is consistent with and slightly reduced from the <br />water demand evaluated and disclosed in the County Project’s WSE (See Table 1 of the WSE).61 <br />According to the City’s 2020 Urban Water Management Plan (UWMP), the City’s projected water <br />demand during normal years is expected to increase from 18,240 AFY in 2025, to 20,036 AFY in <br />2045.62 Based on the projected water demand evaluated in the Prior FEIR for the County Project, this <br />would equate to approximately 0.23 percent of the projected City water supply totals forecasted for <br />the year 2045, with the proposed project likely constituting substantially the same, albeit a nominally <br />lower, percentage. Consistent with the Housing Element Update Program EIR and subsequent water <br />supply evaluations, this level of demand would be accommodated within the City’s diversified water <br />supply portfolio, including Zone 7 contractual supplies, even under conditions where certain local <br />groundwater sources remain unavailable. Furthermore, based on the City’s 2020 UWMP, the City <br />would be able to fully serve its service area (existing and future users), as well as the proposed <br />project, in normal, single dry and all multi-year drought scenarios, including the highest water demand <br />scenario (5-year drought in 2045), which would result in an expected water demand of 20,036 AFY for <br />the full service area of the City.63 <br />As discussed above, the proposed project would produce a demand similar to, if not less than, the <br />County Project, which estimates a total demand of 47 AFY. The 2020 UWMP projects that its total <br />supply would meet the demand of the normal year scenario and that the purchased water and <br />groundwater supply derived from the Zone 7 is expected to be able to meet the projected demands <br />through 2045, even if there is a 5-year drought.64 Therefore, consistent with the Prior FEIR’s impact <br />conclusions, impacts related to sufficient water supply availability would be less than significant. Thus, <br />the proposed project would not introduce new significant impacts or create substantially more severe <br />significant impacts than those previously identified in the Prior FEIR. No additional analysis is <br />required. <br /> <br />60 Zone 7 Water Agency (Zone 7). 2021. 2020 Urban Water Management Plan. June. <br />61 The proposed project’s estimated water demand includes three components: residential water use, landscaping, and <br />distribution system losses. The residential water demand calculation uses a factor of 52.3 gallons per capita per day <br />(gpcd), multiplied by 588 residents, totaling approximately 30,752.4 gpd, or approximately 34.4 AFY. The proposed <br />project’s estimated total water use from landscaping is approximately 5.89 AFY for the 3.7 acres of landscaped areas. <br />This analysis also uses the same additional demand of 2.8 AFY for distribution system losses as the County Project’s <br />WSE. Therefore, the proposed project would have a total annual water demand of approximately 43.09 AFY. <br />62 City of Pleasanton. 2021. 2020 Urban Water Management Plan. June. <br />63 Ibid. <br />64 Ibid.