Laserfiche WebLink
ARROYO LAGO RESIDENTIAL PROJECT <br />ADDENDUM <br /> <br /> <br />FCS 191 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480036/Addendum/21480036 Arroyo Lago Residential Project Addendum.docx <br />Zone 7 Stormwater Option <br />The Zone 7 Stormwater Option would not increase demand for water supply, wastewater treatment, <br />solid waste, energy, or other utility services, and would not require expansion or modification of <br />existing utility infrastructure, because it was considered in the Prior FEIR. Stormwater would continue <br />to be collected and treated through the proposed bioretention facilities in compliance with applicable <br />City, RWQCB and Zone 7 requirements, and would be subject to Zone 7 approval, eliminating the <br />detention basin, pump facilities, and storm drain force main (as contemplated by the City Stormwater <br />Option), which would reduce reliance on mechanical infrastructure without increasing maintenance <br />demands or system capacity requirements, thereby maintaining the same level of utility service and <br />regulatory compliance. Eliminating the detention basin, pump facilities, and storm drain force main (as <br />contemplated by the City Stormwater Option) would reduce reliance on mechanical stormwater <br />infrastructure, avoiding the need for electrical power, pump operations, and long-term mechanical <br />maintenance, without shifting service demands to other utility systems. Consistent with the impact <br />conclusions in the Prior FEIR, this option would not require expansion of existing stormwater <br />infrastructure, upgrades to downstream facilities, or new utility connections. Accordingly, this option <br />would not conflict with applicable utility plans or policies, and utility impacts would remain less than <br />significant and consistent with the conclusions of the Prior FEIR. <br />Mitigation Measures <br />None. <br />Conclusion <br />There is no new information of substantial importance, changes in the project, or changes in <br />circumstances under which it will be undertaken, identifying new significant effects, nor is there a <br />substantial increase in the severity of previously identified significant impacts related to utilities and <br />service systems. The conclusions from the Prior FEIR remain unchanged when considering the <br />implementation of the proposed project. No further environmental review is required.