My WebLink
|
Help
|
About
|
Sign Out
PC-2026-15
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2026
>
PC-2026-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2026 12:52:06 PM
Creation date
8/5/2026 12:48:39 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/24/2026
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ARROYO LAGO RESIDENTIAL PROJECT <br />ADDENDUM <br /> <br /> <br />FCS 201 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480036/Addendum/21480036 Arroyo Lago Residential Project Addendum.docx <br />Proposed Project Analysis and Conclusion <br />Consistent with the analysis in the Prior FEIR, compliance with and implementation of the mitigation <br />measures listed above, adherence to the robust set of applicable regulatory requirements, and <br />adherence with the City’s applicable General Plan and Municipal Code provisions, as well as <br />standard permit conditions, would ensure that the proposed project would not result in substantial <br />adverse effects on human beings, including effects related to air pollution, seismic and geologic <br />hazards, hazardous materials, flooding and natural disasters, or noise and vibration. Therefore, <br />consistent with the Prior FEIR’s impact conclusions, impacts associated with the proposed project <br />would be less than significant. <br />Mitigation Measures <br />Implement MM AIR-1, MM AIR-3, MM BIO-1a, MM BIO-1b, MM BIO-2a, MM BIO-2b, MM CUL-2a, <br />MM CUL-2b, MM CUL-3, MM GEO-1, MM GEO-6, MM GHG-1, MM GHG-2, MM NOI-1, and MM <br />TRANS-2. <br />Conclusion <br />There is no new information of substantial importance, changes in the project, or changes in <br />circumstances under which it will be undertaken, identifying new significant effects, nor is there a <br />substantial increase in the severity of previously identified significant impacts related to any <br />mandatory findings of significance. The conclusions from the Prior FEIR remain unchanged when <br />considering the implementation of the proposed project. No further environmental review is required.
The URL can be used to link to this page
Your browser does not support the video tag.