330 Land Company, LLC Arroyo Lago <br />9785.004.001 Design-Level Geotechnical Report <br /> <br /> <br /> Page | 3 April 16, 2024 <br />Latest Revision October 31, 2025 <br />1.3 PROJECT DESCRIPTION <br /> <br />We understand the development of the 26.6-acre site will comprise 194 market-rate single-family <br />homes. Forty nine of the homes will be designed with affordable junior Accessory Dwelling Units. <br />The development will also include paved drive-lanes and parking areas spanning the community <br />footprint, an approximately 0.7-acre park located in the community center, 0.5 mile of public <br />walking trails, concrete flatwork, underground utilities, retaining walls, and landscaping features. <br /> <br />The vesting tentative map prepared by CBG dated July 2025, shows anticipated earthwork of up <br />to 7 feet of fill and 4 feet of cut to achieve proposed pad elevations, with an average of 1 to 3 feet <br />of fill across the site. <br /> <br />We anticipate structures will be of wood-frame construction and one to two stories in height. <br />Structural loads are yet to be determined; however, we assume that structural loads will be <br />representative for this type of construction. <br /> <br />2.0 FINDINGS <br /> <br />2.1 SITE HISTORY <br /> <br />Based on review of historical aerials, topographic maps, and provided geotechnical reports, we <br />understand the site was historically part of a mining quarry. Open pit excavation operations within <br />site limits began between 1979 and 1982, in which the site was divided into a larger north ern pit <br />and a smaller southern pit (also known as the Busch Pit) at the southwestern end of the site. The <br />remaining area to the east of Busch Pit was quarried and sloped to accommodate vehicular dirt <br />roads along the boundary of the northern pit and Busch Pit. The approximate limits of Busch Pit <br />are shown in Figure 2A; a historical aerial from 1984 depicting the approximate extents of the <br />northern pit and Busch Pit are shown in Figure 2B. <br /> <br />The northern pit appears to have been quarried to at least 160 feet below ground surface (bgs). <br />We understand backfill operations of the northern pit were completed by 1993. The work was <br />reportedly performed in accordance with the County of Alameda Surface Mining Permit <br />Reclamation Plan (SMP-31), which indicated that the backfill was to be placed in the northern pit <br />in a compacted manner; however, we are unaware of documentation detailing the fill <br />specifications or operations. It is unknown whether the fill was placed in a manner that would be <br />considered to be in conformance with the standard of practice at that time. Therefore, we consider <br />the fill placed in the northern pit to be undocumented and potentially non-engineered. <br /> <br />Busch Pit appears to have been quarried to at least 50 to 70 feet bgs at the same time as the <br />northern pit. Busch Pit was utilized as a stormwater retention pond after the northern pit was filled <br />under SMP-31. According to the testing and observation report provided by Haley & Aldrich dated <br />December 18, 2013, Busch Pit was backfilled to match adjacent site grades in 2013. The fill was <br />placed at a minimum of 90 percent relative compaction in accordance with ASTM D1557. <br /> <br />A historical on-site stockpile was used as backfill material for Busch Pit, and generally consisted <br />of sandy clay to clayey sand. The historical fill stockpile appears to vary from 5 to 15 feet in height. <br />The stockpile was placed sometime between 1993 and 2002. The October 2003 photo shows a <br />cut in the southwestern corner of the stockpile, presumably used as material to grade the <br />residential lots to the northwest of the site. The stockpile resided in its October 2003 configuration