330 Land Company, LLC Arroyo Lago <br />9785.004.001 Design-Level Geotechnical Report <br /> <br /> <br /> Page | 4 April 16, 2024 <br />Latest Revision October 31, 2025 <br />until it was used to backfill Busch Pit in 2013. The approximate extent of the stockpile is shown in <br />Figures 2A, 2B, and 2C. <br /> <br />From November 2018 to November 2019, rough grading of the overall site occurred under the <br />testing and observation of Haley & Aldrich, encompassing both the Busch Pit and northern pit <br />areas according to the final testing and observation report provided by Haley & Aldrich dated <br />December 12, 2019. Up to approximately 2½ feet of fill was placed and 2 feet of cut was <br />excavated to achieve current grades. The extent of the rough grading activities is shown in <br />Figures 2A, 2B, and 2C. <br /> <br />In 2023, an emergency drainage swale was constructed on the project site. The swale begins in <br />the northwestern corner of the site and ties into an existing drainage swale at the southeastern <br />project boundary. The swale has a base width of approximately 4 feet and at a 4:1 slope. <br /> <br />2.2 EXISTING AND NEARBY GEOTECHNICAL DATA <br /> <br />In 2006 and 2009, Treadwell & Rollo performed a geotechnical investigation throughout the <br />greater EPSP site. The explorations within the site boundary included one hollow-stem auger <br />boring drilled to a depth of 100 feet bgs and four cone penetration tests (CPTs) advanced to <br />depths ranging from approximately 45 feet to 99 feet bgs. The logs and associated laboratory test <br />results from the Treadwell & Rollo investigation are presented in Appendix E. The approximate <br />locations of the previous explorations are shown in Figures 2A, 2B, and 2C. <br /> <br />In 2013, Haley & Aldrich tested and observed the placement and compaction of backfill for <br />Busch Pit reportedly in accordance with SMP-31. A subsequent preliminary geotechnical report <br />was prepared by Haley & Aldrich in 2017, providing preliminary discussion on subsurface <br />conditions and seismic hazards. No additional subsurface investigation was included as a part of <br />their scope. <br /> <br />Between November 2018 and November 2019, Haley & Aldrich tested and observed the rough <br />grading activities for the overall site in general conformance with rough grading plans prepared <br />by Kier and Wright. Up to 2½ feet of fill was placed and 2 feet of cut was performed. A drainage <br />swale was also constructed to facilitate drainage from the northern portion of the site to an off-site <br />culvert to the east of the site. <br /> <br />ENGEO performed field explorations at the site as part of our preliminary geotechnical study in <br />2023. We retained a CPT rig in November 2022 to advance five CPTs to a maximum depth of <br />162½ feet bgs. The CPT contractor performed pore pressure dissipation (PPD) tests to measure <br />piezometric water pressure in each CPT at various depths and collected seismic shear -wave <br />velocity (VS) measurements in one of the CPT using the downhole seismic method specified in <br />ASTM D7400. <br /> <br />As part of our 2023 preliminary geotechnical study, we also retained the services of a contractor <br />to excavate test pits from 10 to 10½ feet bgs. We observed the test pit excavation and logged the <br />subsurface conditions at each location. The location of the CPTs and test pits are shown in <br />Figure 2, with logs from both explorations presented in Appendix D. <br /> <br />