Laserfiche WebLink
330 Land Company, LLC Arroyo Lago <br />9785.004.001 Design-Level Geotechnical Report <br /> <br /> <br /> Page | 7 April 16, 2024 <br />Latest Revision October 31, 2025 <br />Soil Classification System. The logs graphically depict the subsurface conditions encountered at <br />the time of the exploration. <br /> <br />2.5.1 Existing Fill <br /> <br />Existing fill was encountered up to at least 101½ feet bgs in our current exploration, and up to <br />162½ feet bgs in our prior explorations. Three of the four borings of our current explorations <br />terminated in the fill layer prior to encountering native material. <br /> <br />The fill material encountered in our borings generally consisted of stiff to hard sandy lean clay <br />with varying amounts of fine gravel and sand, with interbedded silty and clayey sand layers with <br />varying amounts of gravel. <br /> <br />According to the SMP-31 application, the quarry slopes were graded to ¾:1 (horizontal:vertical) <br />on the northern side of the pit and 1:1 on the western and southern sides of the pit prior to fill <br />placement. The excavation depth ranged between 128 and 130 feet below existing grade. We are <br />unaware of documentation detailing the fill specifications or operations that could verify that the <br />fill was placed in conformance with the SMP-31 application. <br /> <br />The clayey fill generally has a low to high plasticity, with plasticity indexes between 9 and 32. <br />Debris was not observed in our current or previous explorations; however, debris may be <br />encountered in locations not sampled given the site history and variability in fill placement. <br /> <br />Moisture content tests from previous and current explorations within the site range between 7.9 to <br />18.6 percent, which is generally lower than the typical range of moisture contents encountered in <br />the larger EPSP site and similar to a typical moisture content range for native soil or engineered <br />fill. Similarly, dry unit weight tests from our current explorations range between 111.6 and <br />130.8 pounds per cubic foot (pcf), similar to a typical unit weight range for engineered fill. <br /> <br />2.5.2 Engineered Fill (Busch Pit) <br /> <br />As described in Section 2.2, fill was placed and compacted under the observation of <br />Haley & Aldrich up to approximately 70 feet bgs. According to documented fill placement and <br />compaction records, the fill generally consists of brown sandy lean clay from site and import <br />sources compacted to at least 90 percent relative compaction. No moisture content specification <br />was recommended for soil placement. <br /> <br />2.5.3 Floodplain Deposits <br /> <br />Floodplain deposits were interpreted as directly underlying the existing fill in both areas, and <br />generally consist of dense to very dense clayey sand and gravel and stiff to very stiff lean clay. <br />Boring 1-B3 encountered a dense to very dense clayey gravel layer from 88 feet bgs to termination <br />depth at 101½ feet bgs. <br /> <br />2.6 GROUNDWATER CONDITIONS <br /> <br />Static groundwater was estimated at approximately 45 feet bgs in 1-CPT2 according to pore <br />pressure dissipation tests. Groundwater was not recorded in prior subsurface explorations. <br />Plate 1.2 of the Seismic Hazard Zone Report for the Livermore Quadrangle (2008) maps the <br />highest historical groundwater within the site vicinity to be approximately between 60 to <br />70 feet bgs.