330 Land Company, LLC Arroyo Lago <br />9785.004.001 Design-Level Geotechnical Report <br /> <br /> <br /> Page | 16 April 16, 2024 <br />Latest Revision October 31, 2025 <br />The duration required to achieve the desired degree of settlement based on future loads could <br />vary across the site based on the variability of subsurface conditions. The surcharge should be <br />monitored with settlement plates and surface settlement markers, as further discussed in Section <br />5.2.1. The surcharge can be removed once sufficient settlement has been achieved, as evaluated <br />by the geotechnical engineer. <br /> <br />Surcharge loads should extend a lateral distance of at least 5 feet beyond improvement limits <br />(such as streets and utility corridors) and at least 10 feet beyond building pad limits. Surcharge <br />fills should be sloped no steeper than 1:1 (horizontal:vertical); where this is not feasible, a vertical <br />surcharge can be constructed using the Tensar temporary retaining wall system or a similar <br />wrapped-face, geosynthetic-reinforced wall system. If the surcharge is planned to remain as civil <br />fill after the surcharge program, the fill should be compacted to the specifications described in <br />Section 5.6. <br /> <br />5.2.1 Surcharge Settlement Monitoring Program <br /> <br />The surcharge should be monitored with settlement plates and surface settlement markers, at the <br />least. The surcharge can be removed once sufficient settlement has been achieved, as evaluated <br />by the geotechnical engineer. The settlement-monitoring plates should be installed prior to <br />surcharge placement to monitor compression. The number and location of the <br />settlement-monitoring plates should be determined by us once the surcharge staging has been <br />determined. <br /> <br />The settlement-monitoring plates should be surveyed to determine elevations at least weekly for <br />the first month and then bi-weekly for the next 5 months, or if we have determined that the desired <br />degree of surcharge-driven pre-compression has been achieved. All readings of settlement shall <br />be tied to benchmarks established well beyond the zone of surcharge influence. Traditional survey <br />techniques should be used to survey the target affixed to the top of each monitoring point . <br /> <br />A piezometer may be installed in conjunction with settlement plates to evaluate the pore pressure <br />dissipation of the compressible material and better inform the estimated duration of the program. <br /> <br />5.3 DIFFERENTIAL FILL SLOPE MITIGATION <br /> <br />5.3.1 Busch Pit <br /> <br />Lots affected by differential fill slope conditions in Busch Pit are shown in Figure 2C. We present <br />two potential options to mitigate the differential fill slope condition for the site. <br /> <br />5.3.1.1 Option 1: Subexcavation and Recompaction <br /> <br />The existing cut-to-fill transition material may be partially subexcavated to minimize the potential <br />for differential movement below building footprints. We recommend that building pads be <br />underlain with a minimum of 5 feet of uniformly graded engineered fill subgrade. This can be <br />accomplished by reworking the upper 4 feet below finished pad grade and processing the fifth <br />foot in place. The fill should be compacted to the specifications described in Section 5.6. The <br />subexcavation should extend at least 5 feet beyond building pad limits. <br /> <br />Following subexcavation and recompaction, we estimate differential fill settlement to be less than <br />½ inch over a span of 50 feet. <br />