My WebLink
|
Help
|
About
|
Sign Out
PC-2026-15
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2026
>
PC-2026-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2026 12:52:06 PM
Creation date
8/5/2026 12:48:39 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/24/2026
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
330 Land Company, LLC Arroyo Lago <br />9785.004.001 Design-Level Geotechnical Report <br /> <br /> <br /> Page | 18 April 16, 2024 <br />Latest Revision October 31, 2025 <br />5.6 FILL PLACEMENT <br /> <br />After subexcavation and recompaction of undocumented fill in cut-to-fill transition material, where <br />applicable, the exposed non-yielding surface of areas to receive fill or to be left at grade should <br />be scarified to a depth of 12 inches, moisture conditioned, and recompacted to provide adequate <br />bonding with the initial lift of fill. The loose lift thickness should not exceed 12 inches or the depth <br />of penetration of the compaction equipment used, whichever is less. The following compaction <br />control requirements should be applied to all fill, including backfill, except for landscape areas. <br /> <br />TABLE 5.6-1: Compaction Control Requirements <br />FILL LOCATION MATERIAL TYPE <br />REQUIRED RELATIVE <br />COMPACTION** <br />(%) <br />MINIMUM <br />MOISTURE CONTENT <br />(percentage points <br />above optimum) <br />General Fill Expansive* 87 to 92 4 <br />Low-Expansive* 90 2 <br />Pavement and Flatwork <br />Subgrade* <br />Expansive* 90 4 <br />Low-Expansive* 95 1 <br />Pavement and Flatwork <br />Aggregate Base Class 2 Aggregate Base 95 0 <br />* Expansive: PI greater than 20 <br /> Low-Expansive: PI less than 20 <br />** Relative compaction refers to the in-place dry density of soil expressed as a percentage of the maximum dry density <br />of the same material. <br /> <br />5.7 UNDERGROUND UTILITY BACKFILL <br /> <br />The contractor is responsible for conducting trenching and shoring in accordance with Cal/OSHA <br />requirements. Project consultants involved in utility design should specify pipe-bedding materials. <br />Exercise care where utility trenches are located beside foundation areas. Locate utility trenches <br />constructed parallel to foundations entirely above a plane extending down from the lower edge of <br />the footing at an angle of 45 degrees. Provide utility companies and landscape architects with this <br />information. <br /> <br />Where utility trenches cross underneath buildings or cross perimeter building foundations, we <br />recommend that a plug be placed within the trench backfill to prevent the normally granular bedding <br />materials from acting as a conduit for water to enter beneath the building . The plug should be <br />constructed using sand-cement slurry (minimum 28-day compressive strength of 500 psi) or <br />relatively impermeable native soil for pipe bedding and backfill. We recommend that the plug extend <br />for a distance of at least 3 feet in each direction from the point where the utility enters the building <br />perimeter. <br /> <br />Use well-graded import less than ¾ inch in maximum dimension for pipe zone backfill (i.e., material <br />beneath and immediately surrounding the pipe). Use fine- to medium-grained sand or a well-graded <br />mixture of sand and gravel for pipe zone backfill import material. Avoid using this material within <br />2 feet of finish grades. In general, avoid using uniformly graded gravel for pipe or trench zone backfill <br />due to the potential for migration of: (1) soil into the relatively large void spaces present in this type <br />of material; and (2) water along trenches backfilled with this type of material. Native soil for trench <br />zone backfills (i.e., material placed between the pipe zone backfill and the ground surface) should <br />be compacted in accordance with recommendations in Section 5.6. <br />
The URL can be used to link to this page
Your browser does not support the video tag.