My WebLink
|
Help
|
About
|
Sign Out
PC-2026-15
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2026
>
PC-2026-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2026 12:52:06 PM
Creation date
8/5/2026 12:48:39 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/24/2026
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
330 Land Company, LLC Arroyo Lago <br />9785.004.001 Design-Level Geotechnical Report <br /> <br /> <br /> Page | 26 April 16, 2024 <br />Latest Revision October 31, 2025 <br />9.0 LIMITATIONS AND UNIFORMITY OF CONDITIONS <br /> <br />This report presents geotechnical recommendations for design of the residential community <br />discussed in Section 1.3 for the Arroyo Lago project. If changes occur in the nature or design of <br />the project, we should be allowed to review this report and provide additional recommendations, <br />if any. It is the responsibility of the owner to transmit the information and recommendations of this <br />report to the appropriate organizations or people involved in design of the project, including but <br />not limited to developers, owners, buyers, architects, engineers, and designers. <br /> <br />We strive to perform our professional services in accordance with generally accepted principles <br />and practices currently employed in the area; there is no warranty, express or implied. There are <br />risks of earth movement and property damages inherent in building on or with earth materials. <br />We are unable to eliminate all risks; therefore, we are unable to guarantee or warrant the results <br />of our services. <br /> <br />This report is based upon field and other conditions discovered at the time of report preparation. <br />We developed this report with limited subsurface exploration data. Given the highly variable <br />nature of the soils at this site, the subsurface exploration data may not be representative of the <br />actual subsurface conditions across the site. Considering possible underground variability of soil, <br />rock, stockpiled material, and groundwater, additional costs may be required to complete the <br />project. We recommend that the owner establish a contingency fund to cover such costs. If <br />unexpected conditions are encountered, notify us immediately to review these conditions and <br />provide additional and/or modified recommendations, as necessary. <br /> <br />Our services did not include excavation sloping or shoring, flood potential, or a geohazard <br />exploration. In addition, our geotechnical exploration did not include work to determine the <br />existence of possible hazardous materials. If any hazardous materials are encountered during <br />construction, notify the proper regulatory officials immediately. <br /> <br />We determined the lines designating the interface between layers on the exploration logs using <br />visual observations. The transition between the materials may be abrupt or gradual. The <br />exploration logs contain information concerning samples recovered, indica tions of the presence <br />of various materials such as clay, sand, silt, rock, existing fill, etc., and observations of <br />groundwater encountered. The field logs also contain our interpretation of the subsurface <br />conditions between sample locations. Therefore, the logs contain both factual and interpretative <br />information. Our recommendations are based on the contents of the final logs, which represent <br />our interpretation of the field logs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.