330 Land Company, LLC Arroyo Lago <br />9785.004.001 Design-Level Geotechnical Report <br /> <br /> <br /> Page | 25 April 16, 2024 <br />Latest Revision October 31, 2025 <br />8.0 PAVEMENT DESIGN <br /> <br />8.1 FLEXIBLE PAVEMENT <br /> <br />Based on our experience with similar variable soil materials in the vicinity of the site, it is our <br />opinion that a preliminary R-value of 5 is recommended for design. Using estimated traffic indexes <br />for various pavement loading requirements, we developed the following minimum recommended <br />pavement sections using Chapter 630 of the Caltrans Highway Design Manual (including the <br />asphalt factor of safety), presented in the table below. <br /> <br />TABLE 8.1-1: Minimum Asphalt Concrete Pavement Sections <br />TRAFFIC INDEX ASPHALT CONCRETE <br />(inches) <br />CLASS 2 AGGREGATE BASE <br />(inches) <br />5 3 10 <br />6 3½ 13 <br />7 4 16 <br />8 5 18 <br />9 5½ 21 <br />Note: Class 2 Aggregate Base material with a minimum R-value of 78. <br /> <br />These sections are for estimating purposes only and may not include required city minimums. If <br />desired, reduced sections may be possible based on R-value tests performed on samples of <br />actual subgrade materials recovered at the time of grading. Pavement con struction and all <br />materials should comply with the requirements of the Standard Specifications of the State of <br />California Department of Transportation, civil engineer, and appropriate public agency. <br /> <br />8.2 RIGID PAVEMENT <br /> <br />Concrete pavement sections can be used to resist heavy loads and turning forces in areas such <br />as fire lanes or trash enclosures. Final design of rigid pavement sections, and accompanying <br />reinforcement, should be performed based on estimated traffic loads and frequencies. We <br />recommend the following minimum design sections for rigid pavements. <br /> <br />• A minimum section of 6 inches of Portland Cement concrete should be used over 6 inches of <br />Caltrans Class 2 Aggregate Base (AB). <br />• Concrete pavement should have a minimum 28-day compressive strength of 3,000 psi. <br />• Control joint spacing should be in accordance with Portland Cement Association guidelines. <br /> <br />8.3 PAVEMENT SUBGRADE PREPARATION <br /> <br />Finished subgrade and aggregate base should be compacted in accordance with Section 5.6. <br />Aggregate base should meet the requirements for ¾-inch maximum Class 2 AB in accordance <br />with Section 26-1.02B of the latest Caltrans Standard Specifications. <br /> <br />Subgrade soil and aggregate base materials should be in a stable, non-pumping condition at the <br />time aggregate baserock materials and pavement are to be placed and compacted. Proof -rolling <br />with a heavy wheel-loaded piece of construction equipment should be implemented. Yielding <br />materials should be appropriately mitigated, with suitable mitigation measures developed in <br />coordination with the client, contractor, and geotechnical engineer.