Laserfiche WebLink
<br />330 Land Company, LLC 9785.004.001 <br />Arroyo Lago October 31, 2025 <br />RESPONSE TO CITY REVIEW COMMENTS Page 2 <br /> <br />ENGEO Response to Comment 2 <br /> <br />No exceptions taken; the geotechnical report has been revised to reflect the latest Vesting <br />Tentative Map dated July 2025. References to CBG’s old 2022 Vesting Tentative Map have also <br />been replaced with the Vesting Tentative Map dated July 2025. <br /> <br />BSK Comment 3 – Geotechnical Report, Section 2.5, Subsurface Conditions <br /> <br />This section references up to 70 feet of fill in the Busch Pit, whereas Figures 2A, 2B and 2C <br />indicate 80.5 feet of undocumented fill. We believe the reference to 70 feet may be in error and <br />should be revised for accuracy. <br /> <br />ENGEO Response to Comment 3 <br /> <br />The “Filling of Busch Pit” geotechnical letter prepared by Haley & Aldrich dated <br />December 18, 2013, states that “the surface elevation of Busch Pit varied from approximately <br />50 feet deep at the southern end to 70 feet deep at the northern end.” In contrast, 1-CPT5 from <br />our geotechnical report shows material interpreted as fill extending up to 80½ feet below the <br />ground surface and is outside the Busch Pit area. Both values are accurate to their respective <br />areas. <br /> <br />BSK Comment 4 – Geotechnical Report, Section 2.5.1, Existing Fill <br /> <br />This section refers to the clayey fill at the site having a low to medium plasticity with a plasticity <br />index ranging from 9 to 21. The remainder of the geotechnical report references low to high <br />plasticity. Also, there is a plasticity index as high as 32 reported at a depth of about 13 feet below <br />ground surface (bgs) in boring 1-B3. This discussion should be revised for consistency. <br /> <br />ENGEO Response to Comment 4 <br /> <br />This section has been revised to clarify that the clayey fill at the site has a low to high plasticity <br />with a plasticity index ranging from 9 to 32. <br /> <br />BSK Comment 5 – Geotechnical Report, Section 2.5.2, Engineered Fill (Busch Pit) <br /> <br />This section indicates that no moisture content specification was recommended by Haley & Adrich <br />for the soil placement at Busch Pit. The 2013 Haley & Aldrich letter recommended “at or near <br />optimum” moisture content for engineered fill placed in the pit. This discussion should be revisited <br />for accuracy. <br /> <br />ENGEO Response to Comment 5 <br /> <br />It is our opinion that a moisture content specification was not recommended by Haley & Aldrich; <br />the 2013 Haley & Aldrich letter states “the fill was moisture-conditioned, as needed, to a point at <br />or near its optimum moisture content.” The letter subsequently states that Haley & Aldrich <br />personnel used the nuclear gauge to verify the compaction for each lift; there is no mention of <br />using the nuclear gauge to verify the moisture content of each lift. <br /> <br />