My WebLink
|
Help
|
About
|
Sign Out
PC-2026-15
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2026
>
PC-2026-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2026 12:52:06 PM
Creation date
8/5/2026 12:48:39 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/24/2026
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ARROYO LAGO RESIDENTIAL PROJECT <br />ADDENDUM <br /> <br /> <br />FCS 71 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480036/Addendum/21480036 Arroyo Lago Residential Project Addendum.docx <br />forest land to non-forest use. Therefore, the Prior FEIR concluded that no impact related to <br />agriculture or forestry resources would occur. (Draft EIR, p. 4-1). <br />Proposed Project Analysis and Conclusion <br />The project site involves the same land evaluated in the Prior FEIR and, therefore, consistent with the <br />determinations made in the Prior FEIR, the proposed project would have no impacts related to <br />agriculture and forestry resources. The project site is not designated as Prime Farmland, Unique <br />Farmland, or Farmland of Statewide Importance, and is not encumbered by a Williamson Act Contract <br />or zoned for Timberland Production. <br />While the project site is currently zoned A by the County’s zoning ordinance, the project site would be <br />rezoned to PUD-MDR as part of the proposed project. Therefore, the proposed project would not <br />conflict with the project site’s agricultural zoning. Further, the proposed project site is mapped as <br />“Other Land,” confirming that there would be no impact to land classified as Farmland or Forestland. <br />The project site has a nonagricultural soil classification and is not under a Williamson Act Contract. <br />Therefore, the proposed project would not introduce new significant impacts or create substantially <br />more severe significant impacts than those previously identified in the Prior FEIR. No additional <br />analysis is required. <br />Zone 7 Stormwater Option <br />Consistent with the analysis in the Prior FEIR, the Zone 7 Stormwater Option would not result in any <br />new or more severe agricultural impacts. It would not convert FMMP-designated farmland, conflict <br />with agricultural zoning, or result in the loss or indirect conversion of agricultural land; therefore, <br />impacts would remain less than significant and consistent with the Prior FEIR. <br />Mitigation Measures <br />None. <br />Conclusion <br />There is no new information of substantial importance, changes in the project, or changes in <br />circumstances under which it will be undertaken, identifying new significant effects, nor is there a <br />substantial increase in the severity of previously identified significant impacts related to agriculture <br />and forestry resources. The conclusions from the Prior FEIR remain unchanged when considering the <br />implementation of the proposed project. No further environmental review is required.
The URL can be used to link to this page
Your browser does not support the video tag.