Laserfiche WebLink
ARROYO LAGO RESIDENTIAL PROJECT <br />ADDENDUM <br /> <br /> <br />FCS 77 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480036/Addendum/21480036 Arroyo Lago Residential Project Addendum.docx <br />c) Sensitive Receptors <br />Would the project: Expose sensitive receptors to substantial pollutant concentrations? <br />Prior FEIR Conclusions <br />Sensitive receptors near the project site include residential neighborhoods directly adjacent to the <br />west, less than 50 feet from the project site. The Prior FEIR evaluated potential exposure to toxic air <br />contaminants (TACs), particularly diesel particulate matter (DPM) during construction. A construction- <br />related Health Risk Assessment (HRA) was conducted, which determined that impacts could be <br />potentially significant because cancer risk resulting from the construction of the County Project would <br />exceed the Bay Area Air District’s project-level significance thresholds. As such, the County Project <br />would be required to implement MM AIR-3, which includes the use of Tier 4 interim engines and <br />preparation of a construction operations plan. These measures would reduce construction-related <br />exposure to TACs for nearby sensitive receptors to a less than significant level. Construction and <br />operational air emissions would be reduced under Alternative 2 because off-site utility improvements <br />would not be built, resulting in a smaller total impact area and less disturbance. However, the same <br />identified mitigation would still be required. <br />In terms of operational impacts, the Prior FEIR determined that the County Project would not be a <br />significant source of TAC, DPM, or carbon monoxide (CO). Additionally, the First Production Phase (in <br />the northwest part of the project site) was assumed to start in October 2025 and be completed in late <br />May 2026, when the first group of occupants would be expected to move into the completed houses; <br />the surrounding vertical construction would continue until late August 2027. <br />The Prior FEIR determined that the first group of occupants’ exposure to criteria pollutants would not <br />exceed the Bay Area Air District health risk threshold from DPM generated during the subsequent 15 <br />months of vertical construction; therefore, the DPM health risk impact for the first group of occupants <br />would be less than significant, and operational impacts were also found to be less than significant. <br />Criteria pollutant emissions would remain below significance thresholds, and required mitigation for <br />fugitive dust and construction health risks would still apply. (Draft EIR, pp. 6-12–6-13). Therefore, the <br />Prior FEIR concluded that impacts would be less than significant with mitigation incorporated. (Draft <br />EIR, pp. 3.2-25, 6-12). <br />Proposed Project Analysis and Conclusion <br />The closest sensitive receptors to the project site include single-family residences located <br />immediately to the west, less than 50 feet from the project site. <br />Unlike regional emissions, localized emissions are typically evaluated in terms of air concentration <br />rather than mass, so they can be more readily correlated to potential health effects. As described in <br />the Prior FEIR, the cancer risk resulting from the construction of the County Project would exceed the <br />Bay Area Air District’s project-level significance thresholds. The proposed project would be <br />substantially similar to the County Project, though with fewer proposed dwelling units, in addition to a <br />substantial reduction in off-site improvements, including the removal of the proposed water storage <br />and booster pump facility, WWTP, recycled water storage, and agricultural irrigation fields from the