My WebLink
|
Help
|
About
|
Sign Out
PC-2026-15
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2026
>
PC-2026-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2026 12:52:06 PM
Creation date
8/5/2026 12:48:39 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/24/2026
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ARROYO LAGO RESIDENTIAL PROJECT <br /> ADDENDUM <br /> <br /> <br />80 FCS <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480036/Addendum/21480036 Arroyo Lago Residential Project Addendum.docx <br />Additionally, the Prior FEIR identified Vulcan Materials Company (501 El Charro Road, Pleasanton, <br />94588), located approximately 1.5 miles east of the project site, as a potential odor producer. Public <br />records retrieved from the Bay Area Air District show that one odor complaint was made in August <br />2025, and the Bay Area Air District reporting inspector subsequently informed Vulcan Materials <br />Company of this complaint. However, an updated public records request conducted in April 2026 (the <br />latest available at the time of writing) indicates that no additional odor complaints had been filed for <br />Vulcan Materials Company since then. Based on the odor guidelines by the Bay Area Air District, odor <br />impacts would be significant if more than five confirmed odor complaints are received for a facility or <br />location per year, averaged over the past three years. Therefore, Vulcan Materials Company currently <br />does not present a significant odor impact to nearby sensitive receptors. Should Vulcan Materials <br />Company cause any nuisance for future residents, Vulcan Materials Company would be required to <br />comply with the Bay Area Air District Regulation 1 Rule 301 (odorous emissions) and implement <br />applicable control measures to reduce the odor impacts. Based on the absence of documented <br />complaints and the regional wind conditions, substantial odor impacts on future residents are not <br />anticipated, and impacts would be less than significant. <br />In summary, consistent with the Prior FEIR’s conclusions, construction and operation of the proposed <br />project would not result in emissions adversely affecting a substantial number of people; impacts <br />would be less than significant. <br />Therefore, the proposed project would not introduce new significant impacts or create substantially <br />more severe significant impacts than those previously identified in the Prior FEIR. No additional <br />analysis is required. <br />Zone 7 Stormwater Option <br />The Zone 7 Stormwater Option would not result in any new or more severe air quality impacts since it <br />was previously considered in the Prior FEIR. The configuration would eliminate the need for <br />construction and operation of the detention basin, pump facilities, and storm drain force main, thereby <br />incrementally reducing construction-related equipment use and associated emissions; however, all <br />mitigation measures would remain applicable to the proposed project. Consistent with the evaluation <br />in the Prior FEIR, operation of the Zone 7 Stormwater Option would not generate new stationary or <br />mobile sources of air emissions. Accordingly, air quality impacts would remain less than significant <br />and consistent with the conclusions of the Prior FEIR. <br />Mitigation Measures <br />MM AIR-1 Implement Bay Area Air District Best Management Practices to Control Dust <br />During Construction <br />The following dust control measures, as recommended by the Bay Area Air Quality <br />Management District (Bay Area Air District), shall be included in the design of the <br />proposed project and implemented during construction:
The URL can be used to link to this page
Your browser does not support the video tag.