My WebLink
|
Help
|
About
|
Sign Out
PC-2026-15
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2026
>
PC-2026-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2026 12:52:06 PM
Creation date
8/5/2026 12:48:39 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/24/2026
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ARROYO LAGO RESIDENTIAL PROJECT <br />ADDENDUM <br /> <br /> <br />FCS 79 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480036/Addendum/21480036 Arroyo Lago Residential Project Addendum.docx <br />Bay Area Air District Regulation 1, Rule 301 and Regulation 7 govern odorous emissions and public <br />nuisance thresholds. Although the County Project’s WWTP could be a potential source of odors, the <br />Prior FEIR determined that it would include odor control systems. The Bay Area Air District’s odor <br />screening thresholds were applied, and the County Project was found to be outside the screening- <br />level distances for odor-generating facilities. The Prior FEIR determined that the County Project was <br />not expected to generate odors that would affect a substantial number of people, and no mitigation <br />was deemed necessary. Any potential odor impacts would be further reduced under Alternative 2 <br />because the WWTP and related facilities would not be built. (Draft EIR, pp. 6-12–6-13). Therefore, the <br />Prior FEIR concluded that construction- and operation-related impacts would be less than significant. <br />(Draft EIR, pp. 3.2-56, 6-12, 6-13). <br />Proposed Project Analysis and Conclusion <br />Consistent with the analysis in the Prior FEIR, during construction activities, construction equipment <br />exhaust and application of asphalt and architectural coatings would temporarily generate odors. Any <br />construction-related odor emissions would be temporary and intermittent. Additionally, any such <br />noxious odors would be confined to the immediate vicinity of the construction equipment. It is <br />anticipated that by the time such emissions reach any sensitive receptor sites, they would be diluted <br />to well below any air quality or odor concern level. Therefore, consistent with the Prior FEIR’s impact <br />conclusions, construction odor impacts would be less than significant. <br />Land uses typically associated with objectionable odors include WWTPs, compost facilities, landfills, <br />solid waste transfer stations, fiberglass manufacturing facilities, paint/coating operations (e.g., auto <br />body shops), dairy farms, petroleum refineries, asphalt batch plants, chemical manufacturing, and <br />food manufacturing facilities, as shown in the 2022 Bay Area Air District CEQA Guidelines. The <br />proposed project would involve the development of residences whose operations could lead to typical <br />odors from associated laundry cleaning, vehicle exhaust, outdoor cooking, and waste disposal. <br />However, such odors generated by project operation would be small in quantity and duration and <br />would not pose an objectionable odor impact to future and existing receptors. The Prior FEIR <br />identified the WWTP included under the County Project as an additional potential odor source, <br />although it confirmed that this would not result in a significant impact. The Prior FEIR also evaluated <br />Alternative 2, which would not include the off-site utility improvements. Similar to Alternative 2, the <br />proposed project would not include the WWTP, removing it as a potential odor source. <br />The proposed project is located approximately 160 feet northwest of Pleasanton Garbage Services <br />Inc., which is a transfer station. CEQA does not require analysis of the environment’s impact on a <br />proposed project (i.e., whether the existing transfer station would subject the new residents to odor or <br />other effects). However, public records from the Bay Area Air District indicate that no confirmed odor <br />complaints have been filed against the facility in the past five years, suggesting a low likelihood of <br />nuisance-level emissions. Additionally, meteorological data from the nearest Bay Area Air District <br />monitoring station in Livermore shows that prevailing winds in the area typically blow from west to <br />east. Given that the project site is located northwest of the transfer station, prevailing wind patterns <br />would generally carry odors away from the proposed development.
The URL can be used to link to this page
Your browser does not support the video tag.