My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL SUPPLEMENTAL MATERIAL 7-27--26
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
072726 REGULAR
>
CITY COUNCIL SUPPLEMENTAL MATERIAL 7-27--26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2026 3:43:05 PM
Creation date
8/6/2026 3:38:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/27/2026
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> 2 <br />The Project, which proposes to develop 189 single-family homes on approximately 29 <br />acres of land north of Busch Road, is within the area that the City has historically referred to <br />as the “East Pleasanton Specific Plan” area, although this specific plan has never been <br />adopted by the City. In connection with its proposed development of the Project, Developer <br />and City staff have engaged in extensive negotiations for a Pre-Annexation and <br />Development Agreement (“PADA”). Based on negotiations with staff to date, Developer’s <br />proposed responsibilities for funding new transportation infrastructure in connection with <br />the Project, including the Future El Charro Extension, would be expected to total <br />approximately $5.2 million,1 including Developer’s voluntary payment to the City of <br />$2,250,000 (the “Payment”) towards the future costs of the Future El Charro Extension <br />(equal to an additional $11,905 per residential unit based on 189 units). <br />Historically, the City took the position that, based on the Planning Documents (as <br />defined below), the costs for the Future El Charro Extension should be allocated 50-50 <br />between developers in the East Pleasanton Specific Plan area (collectively) and the City. For <br />this position to have merit under the applicable law, the City would need to establish that the <br />required essential nexus existed; and further that, for the proposed 50-50 allocation, this <br />was reasonably proportionate. <br />As demonstrated by substantial evidence in the record and as further discussed <br />below, the necessary legal findings cannot be made to support the foregoing position with <br />respect to the Project. Given the long-planned nature of the Future El Charro Extension as <br />backbone infrastructure to serve the existing and planned future growth of the City and the <br />broader region (contemplated since at least the 1990s), combined with the paucity of <br />information or data to support any legal nexus between the Future El Charro Extension and <br />the Project or the proposed 50-50 allocation, there is no basis under applicable law for the <br />City to require Developer to contribute any amounts towards the costs of the Future El <br />Charro Extension due to the failure to satisfy the requisite legal tests. <br />As such, the proposed Payment by Developer towards the future costs of the Future <br />El Charro Extension is best characterized as a voluntary contribution since it otherwise could <br />not be lawfully imposed by the City due to the lack of the required nexus. <br /> <br />II. RELEVANT FACTUAL BACKGROUND <br />To provide relevant factual context for our legal analysis, this section briefly <br />discusses: (1) the history and scope of improvements contemplated for the Future El Charro <br />Extension and related relevant nexus studies/technical analyses; and (2) the lack of any <br />basis for the City to require Developer to contribute toward these improvements (apart from <br />Developer’s TDF contributions). <br />The Future El Charro Extension consists of a four-lane divided road from Stoneridge <br />Drive to Stanley Boulevard with related bike facilities (described as a Class I bike facility <br />along the south side or Class IV bike facilities). These improvements have been contemplated <br />as a necessary regional improvement by Pleasanton as well as the broader Tri-Valley <br />Transportation Council (“TVTC”) for decades. Since at least 1996, long before any residential <br /> <br />1 This amount is comprised of (1) the Payment, (2) $750,000 in frontage improvements, and (3) <br />approximately $2.2m in Transportation Demand Fees payable to the City, but does not include an <br />additional nearly $1.4m in Tri-Valley Transportation Development Fees payable to the TVTC.
The URL can be used to link to this page
Your browser does not support the video tag.