My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL SUPPLEMENTAL MATERIAL 7-27--26
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
072726 REGULAR
>
CITY COUNCIL SUPPLEMENTAL MATERIAL 7-27--26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2026 3:43:05 PM
Creation date
8/6/2026 3:38:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/27/2026
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> 3 <br />development was contemplated for the area, the City has planned for the extension of El <br />Charro Road from Stoneridge Drive to Stanley Boulevard (as depicted in Exhibit A hereto). <br />These planning efforts included assessments in (1) the City’s 2005 General Plan (and related <br />EIR) (adopted in 2009); (2) the 2015 East Pleasanton Specific Plan (and related EIR) (never <br />adopted); and (3) recent cost assessments and impact fee studies, including City’s 2018 <br />development impact fee nexus study (“2018 Nexus Study”), its 2024 update thereto (“2024 <br />Nexus Study”) and a Project-specific El Charro Road Extension Assessment prepared by <br />Fehr & Peers in January 2025 (“2025 F&P Report”). These various documents are referred to <br />collectively as “Planning Documents” in this memorandum. <br />In terms of the allocation of costs for the Future El Charro Extension between City <br />and applicable developers, the Planning Documents do not include any stated basis or other <br />support for the allocation of such costs historically proposed by the City. Instead, it appears <br />that the City directed — without explanation — that 50 percent of the total costs would be <br />covered through the City’s Transportation Development Fee (“TDF”) program (and/or other <br />City revenue) with the remaining 50 percent to be covered by the “East Pleasanton” <br />developers, collectively. For example, the 2018 Nexus Study notes that while cost estimates <br />for the road works for the Future El Charro Extension were prepared by BKF and Fehr & <br />Peers, the allocation of these costs between the East Pleasanton developers and the TDF <br />was set “per direction from the City” without any rationale being provided for this 50-50 <br />allocation. While this 50-50 allocation was not referenced in the 2024 Nexus Study for some <br />unexplained reason, the City has continued to rely on it until recently.2 <br />Finally, the 2025 F&P Report is also not helpful as it does not establish a reasonable <br />basis for allocating any of the expected benefits of the Future El Charro Extension to the <br />Project. <br />III. APPLICABLE LAW <br />The following is a summary of relevant constitutional and statutory provisions <br />governing the imposition of development exactions, including federal and state <br />constitutional principles, relevant state statutes (i.e., the Mitigation Fee Act), and finally, <br />relevant local Pleasanton Municipal Code provisions. <br />A. Common Law/Constitutional Provisions Relating to the Police Power <br />The legal basis for all land use regulation is the police power of a local agency to <br />protect the public health, safety and welfare of its residents. (See Berman v. Parker, 348 U.S. <br />26, 32-33 (1954).) The police power is set forth in the California Constitution, which confers <br />on local agencies the power to “make and enforce within [their] limits all local, police, <br />sanitary, and other ordinances and regulations not in conflict with general laws.” (Cal. Const. <br />art. XI, § 7.) Thus, land use regulations are a manifestation of the local police powers <br />conferred by the California Constitution, rather than reflecting an exercise of specific <br />statutory authority. (See Scrutton v. County of Sacramento, 275 Cal. App. 2d 412, 417 (1969).) <br /> <br /> <br />2 It is important to note that, without explanation, Attachment 1 of the 2024 Nexus Study deleted the <br />reference to the 50-50 allocation. The reason for this deletion is unclear, particularly given the City’s <br />recent recitation of this 50-50 allocation.
The URL can be used to link to this page
Your browser does not support the video tag.