Laserfiche WebLink
Patel <br />Application: PUD-152 <br />March 17, 2026 <br /> <br /> <br />3 <br /> <br />iv. Annotate how many bike parking spaces are provided in the shown bicycle parking <br />illustration. For example, “Bicycle Parking (4 stalls, 8 spaces)”. <br />v. Walkway, trash bins, and unit floor plans are not consistent throughout the plan set. <br />(see below). Revise all plan sheets to be accurate with what the project is proposing. <br />1. Per Pleasanton Garbage Service letter dated October 17, 2025, 12 carts for <br />residential service are required. The number of carts is inconsistent on the <br />plans. Sheet A100 illustrates 12 carts, but Sheet LH-1 illustrates 9 carts. <br />Ensure consistency on all plan sheets. <br /> vi. Clarify the following solid linework by the east side gate (address in Civil/Landscape <br />sheets as well): <br /> g) Sheet LP-1: Illustrate the location of the HVE box and backflow preventer to ensure <br />adequate screening per ODS B9.2 is provided. <br /> <br />3. Story Pole plan will no longer be required. <br /> <br />Page 313 of 373