Laserfiche WebLink
Sam Oakley <br />231 Old Bernal Avenue Tree Inventory, Valuation, and Construction Guidelines <br />9/13/2024 10 <br /> <br /> <br />PO BOX 2412 <br />PISMO BEACH, CA 93448 <br /> <br /> (415) 407-6995 <br />SAM@OAKLEYGROUP.ORG <br />WWW.OAKLEYGROUP.ORG <br /> <br />Tree Protection Fences <br /> <br />Trees are often killed, injured or stressed is a direct result of the construction process. A <br />TPZ is to be installed with the parameter of either ten (10) times the diameter of the trunk <br />at four and half (4.5) feet above natural grade or ten (10) feet, whichever is greater. To <br />protect trees, install a six (6) foot high chain-link fence with post driven into the ground <br />every ten to twelve (10-12) feet. The fencing should be located at the TPZ perimeter and <br />not disturbed for any reason. Warning Signage indicating, “Tree Protection Zone: Keep <br />Out,” or similar wording at the direction of the Project Arborist, shall be placed in two (2) <br />visible locations on opposite sides of the tree. All fencing and protection should be in <br />place before any construction begins and left until all landscape grading and trenching is <br />complete. Avoid placing of underground utilities within the drip line of any tree. When <br />utilities are run through the root zone of a tree, horizontal coring should be used instead of <br />trenching. If it is not possible to use horizontal coring, the onsite certified arborist should <br />be contacted before trenching begins. <br /> <br />Recommended Services <br /> <br />Any tree subjected to the impacts of construction activities should be pruned prior to the <br />commencement of construction. Pruning can be done during the tenure of construction so <br />long as it is deemed necessary by the Project Arborist. All services recommended in this <br />report should be done by a Certified Arborist or Certified Tree Worker in accordance with <br />the ANSI-A300 standards. All pruning necessary to provide clearance during construction <br />should be performed by a Certified Arborist or Tree Worker and not undertaken by <br />construction personnel. Accidental damage to trees should receive immediate corrective <br />attention. Pruning shall cease after construction has stopped and is to occur only as needed <br />for proper maintenance. <br /> <br />Any tree subjected to the impacts of construction activities should be fertilized prior to the <br />commencement of construction. Where deep root fertilization has been recommended, a <br />solution of four (4) pounds of Doggett’s 32-7-7 per one hundred (100) gallons of water <br />should be used. This should be injected at the rate of ten (10) gallons per inch of trunk <br />diameter at one- to two hundred (200-300) pounds of pressure. Unless otherwise stated, <br />fertilization should take place between May and September. Mycorrhiza inoculum: Trees <br />are to have roots inoculated with endo/ectomycorrhizal fungal inoculum. Fertilization <br />shall occur prior to, during, and after construction under the direction of the Project <br />Arborist. <br /> <br /> <br /> <br /> <br /> <br />Page 344 of 373