My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL SPECIAL MEETING AGENDA PACKET 8-11-26
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
081126 SPECIAL
>
CITY COUNCIL SPECIAL MEETING AGENDA PACKET 8-11-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2026 9:09:20 AM
Creation date
8/7/2026 8:56:02 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/11/2026
DESTRUCT DATE
15Y
DOCUMENT NAME
SPECIAL MEETING AGENDA PACKET
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sam Oakley <br />231 Old Bernal Avenue Tree Inventory, Valuation, and Construction Guidelines <br />9/13/2024 11 <br /> <br /> <br />PO BOX 2412 <br />PISMO BEACH, CA 93448 <br /> <br /> (415) 407-6995 <br />SAM@OAKLEYGROUP.ORG <br />WWW.OAKLEYGROUP.ORG <br /> <br />Construction Guidelines <br /> <br />• Do not use tree trunks as a winch support in demolition or for moving and lifting <br />large loads. <br /> <br />• Do not dump concrete residue, chemicals, solvents, etc., on site. <br /> <br />• Do not attempt the demolition of trees with grading equipment when trees that are <br />to be preserved are in the vicinity. Trees uprooted by pushing or pulling may <br />damage branches or root systems of adjacent trees. All trees and stumps should be <br />removed by a qualified company. <br /> <br />• Grade and trench lines radial to trees rather than tangential. If roots are <br />encountered while trenching, follow root severance guidelines. <br /> <br />• If soil compaction has occurred near or within the CRZ by operating of heavy <br />equipment or other operations, aerate (fracture) soil as quickly as practical. <br /> <br />• If demolition of existing roads, structures, etc. is near any tree to be preserved, a <br />small soft-rubber tire loader should be used. Any work within six (6) feet of any <br />trunk should be performed by hand. <br /> <br />Maintenance Guidelines <br /> <br />• All recommended services should be performed before construction ends. Pruning <br />shall cease after construction and only be performed as directed by a Certified <br />Arborist for maintenance purposes. <br /> <br />• Continuance of irrigation for one to eight (1-8) months, or as directed by a Certified <br />Arborist. Gradually reduce irrigation to avoid overwatering. <br /> <br />• Provide the new property owners with information they will require for proper <br />maintenance of trees on the property. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Page 345 of 373
The URL can be used to link to this page
Your browser does not support the video tag.