My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL SPECIAL MEETING AGENDA PACKET 8-11-26
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
081126 SPECIAL
>
CITY COUNCIL SPECIAL MEETING AGENDA PACKET 8-11-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2026 9:09:20 AM
Creation date
8/7/2026 8:56:02 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/11/2026
DESTRUCT DATE
15Y
DOCUMENT NAME
SPECIAL MEETING AGENDA PACKET
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sam Oakley <br />231 Old Bernal Avenue Tree Inventory, Valuation, and Construction Guidelines <br />9/13/2024 12 <br /> <br /> <br />PO BOX 2412 <br />PISMO BEACH, CA 93448 <br /> <br /> (415) 407-6995 <br />SAM@OAKLEYGROUP.ORG <br />WWW.OAKLEYGROUP.ORG <br /> <br />Schedule and Coordination <br /> <br />Trees should be monitored by the Project Arborist during construction at the following <br />intervals: <br /> <br />• Before construction begins, the Project Arborist is to use this preservation plan to <br />implement tree protections with the assigned contractors for all work onsite. <br /> <br />• During the Pre-construction meeting. <br /> <br />• During the Rough Grading or Trenching, or any activity within any TPZ or CRZ. <br /> <br /> <br />• For each Monthly Tree Activity Report Inspection or the interval deemed necessary <br />by the local authorities. <br /> <br />• Any other time deemed necessary by the Project Arborist. <br /> <br />Concluding Remarks <br /> <br />This report is a guideline for the proper maintenance of tree during construction activities. <br />The following activities need to occur, as noted above: <br /> <br />• Preconstruction: root exploration; root pruning; foliar pruning; mulch; irrigation; <br />fertilization; tree protection measures. <br />• During construction: tree protection measures; mulch; irrigation; fertilization; and <br />pruning as needed. <br />• Post-construction: mulch; irrigation; and yearly maintenance pruning as needed. <br /> <br />While trees vary in their tolerance to changed conditions, disruption in any form of the <br />environment to which the trees have grown accustomed, may result in adverse reaction. <br />No assurance can be offered that if all the recommendations and precautionary measures <br />are accepted and followed, the desired results will be achieved. Demolition and <br />construction activity among and near trees is inherently contrary to tree welfare. The <br />objective of these guidelines is to provide information useful in mitigating undesirable <br />consequences resulting from uninformed or careless acts. If strict adherence to all <br />recommendations is performed, we believe the trees will successfully survive construction <br />of the project. <br /> <br /> <br /> <br />Page 346 of 373
The URL can be used to link to this page
Your browser does not support the video tag.