My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET (2)
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
111924 REGULAR
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2026 12:24:12 PM
Creation date
8/17/2026 12:24:09 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/19/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WATER SYSTEM MANAGEMENT PLAN OCTOBER 2024 / CAROLLO <br />CITY OF PLEASANTON WATER SYSTEM MANAGEMENT PLAN iii <br />Abbreviations <br />10-Year CIP 10-Year Capital Improvement Program <br />AACE Advancement of Cost Engineering <br />AC asbestos cement <br />AWIA American Water Infrastructure Act <br />BESS battery energy storage systems <br />Carollo Carollo Engineers <br />CI cast iron <br />CIP Capital Improvement Program <br />City City of Pleasanton <br />CMMS computerized maintenance management system <br />COF consequence of failure <br />DDW Department of Drinking Water <br />DER Distributed Energy Resources <br />DI ductile iron <br />EPA Environmental Protection Agency <br />ERP Emergency Response Plan <br />EUM Effective Utility Management <br />fps feet per second <br />ft foot/feet <br />gpm gallons per minute <br />hp horsepower <br />kW kilowatt(s) <br />LCRI Lead and Copper Rule Improvements <br />MG million gallons <br />mgd million gallons per day <br />O&M operations and maintenance <br />OT operational technology <br />PFAS polyfluoroalkyl substances <br />PGR Pleasanton Generator Report <br />POF probability of failure <br />PV photovoltaic <br />PVC polyvinyl chloride <br />R&R rehabilitation and replacement <br />RCS Residual Control System <br />ROW right-of-way <br />RRA Risk and Resilience Assessment <br />SCADA supervisory control and data acquisition <br />TOU time-of-use management <br />Page 430 of 658
The URL can be used to link to this page
Your browser does not support the video tag.