Laserfiche WebLink
WATER SYSTEM MANAGEMENT PLAN OCTOBER 2024 / CAROLLO <br />CITY OF PLEASANTON WATER SYSTEM MANAGEMENT PLAN ii <br />8.1 O&M Project and Program Recommendations 17 <br />8.1.1 Water Quality Regulatory Review 17 <br />8.1.2 Water Conservation and Water Loss 18 <br />8.1.3 Repair and Replacement Assessment 18 <br />8.1.4 O&M Review 18 <br />8.1.5 SCADA Master Plan 19 <br />8.1.6 O&M Recommendations Summary 19 <br />Appendices <br />APPENDIX A EUM PRIMER <br />APPENDIX B WATER QUALITY REGULATORY REVIEW <br />APPENDIX C CURRENT AND FUTURE WATER CONSERVATION REGULATIONS MEMO <br />APPENDIX D WATER FACILITY CONDITION ASSESSMENT <br />APPENDIX E O&M EVALUATION MEMO <br />APPENDIX F SCADA MASTER PLAN <br />APPENDIX G ENERGY MASTER PLAN <br />APPENDIX H GENERATOR RECOMMENDATIONS <br />APPENDIX I NITRIFICATION EVALUATION <br />APPENDIX J CIP IMPLEMENTATIOM MEMO <br />Tables <br />Table 1 Water Supply - Zone 7 Turnouts 4 <br />Table 2 Booster Station Inventory 4 <br />Table 3 Indirect Cost Factors – Rehabilitation and Replacement 14 <br />Table 4 Indirect Cost Factors – Capacity Projects 14 <br />Table 5 Capital Improvement Plan Summary 15 <br />Table 6 Capital Improvement Plan Summary by Project Type 17 <br />Table 7 O&M Program 20 <br />Figures <br />Figure 1 WSMP and CIP Budget Adoption Cycle 2 <br />Figure 2 Existing Water Distribution System 3 <br />Page 429 of 658