My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET (2)
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
111924 REGULAR
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2026 12:24:12 PM
Creation date
8/17/2026 12:24:09 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/19/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 5 <br />summarized in the table below. <br /> <br /> <br /> <br />As outlined, the WSMP identifies the needed financial investment over the next 20 years; <br />however, the current financial position of the water system enterprise fund is wholly insufficient <br />to address these needs in any substantial way. As such, it is likely that several strategies (e.g., <br />water rate and connection fee increases, grant funding, partnerships, etc.) will need to be <br />utilized toward improving the City's water system. <br /> <br />Funding <br />Two primary funding sources for the water system are new customer connection fees and <br />existing customer user rates. Approximately $22.3 million of the total costs identified in the <br />WSMP are associated with new customer connections. The City is currently conducting a <br />water connection fee study that will utilize the results of the WSMP to calculate and <br />recommend connection fee increases for City Council consideration. The remaining portion of <br />the total costs identified in the WSMP are associated with existing customers and <br />infrastructure. <br /> <br />The City has initiated a water rate study that will utilize the results of the WSMP as a <br />foundation on which to calculate and recommend to the City Council a water rate structure <br />Page 424 of 658
The URL can be used to link to this page
Your browser does not support the video tag.