Laserfiche WebLink
Page 3 of 5 <br />rehabilitation or replacement. <br />• Priority Level B- Projects that provide measurable progress toward achieving the <br />City’s goals, but the City has a moderate level of control as to when these projects <br />should be accomplished. <br />o These projects include decommissioning Wells #5-8, lower priority fire water flow <br />improvements, additional booster station rehabilitation projects, and customer <br />meter replacements. <br />• Priority Level C- Projects anticipated to be needed but may still need to define scopes <br />and schedules or meet the criteria for Priority Levels A and B. <br />o These projects include future water supply treatment projects (i.e., disinfection), <br />lower priority pipeline replacements, tank mixers, and other facility rehabilitation <br />projects. <br /> <br />Class 5 planning level cost estimates per the Association for the Advancement of Cost <br />Engineering (AACE) were prepared for each project. Class 5 estimates may represent an <br />overestimate of cost by 100 percent or an underestimate of cost by 50 percent. The project <br />cost estimates include administration, design, construction, and a contingency of 30 percent. <br />All costs are tied to a May 2024 ENR Index for San Francisco. <br /> <br />The table below provides a cost summary of the recommended CIP based on project category <br />and prioritization. The recommended long-term CIP has been developed to be implemented <br />over a 20-year timeframe. <br /> <br /> <br /> <br />Notably, implementation of the WSMP will require additional City engineering staff to manage <br />projects. The number and timing of staff increases will ultimately depend on the project <br />phasing strategy implemented by the City, but over a 20-year period is estimated to be within <br />the range of $8 million-$12 million. Note that one engineering staff position was already <br />approved in FY24/25 and is not included in this cost range. <br /> <br />Implementation of the WSMP will also result in O&M support requirements with the new <br />infrastructure installed. Additionally, existing infrastructure will continue to age and require <br />additional O&M until Repair & Replacement projects are completed. O&M needs will also <br />depend on the project phasing strategy implemented by the City, but over a 20-year period is <br />estimated to be within the range of $12 million-$18 million. When including combined <br />engineering and O&M cost increases, the implementation of WSMP is estimated to have a <br />funding need of $283 million-$289 million over 20 years. <br /> <br />O&M Program Improvements <br />The WSMP also identifies a list of recommended O&M program improvements to comply with <br />future regulations and be consistent with industry best practices. The recommendations are <br />Page 423 of 658