My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET (2)
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
111924 REGULAR
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2026 12:24:12 PM
Creation date
8/17/2026 12:24:09 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/19/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WATER SYSTEM MANAGEMENT PLAN OCTOBER 2024 / CAROLLO <br />CITY OF PLEASANTON WATER SYSTEM MANAGEMENT PLAN i <br />pw://Carollo/CA/Pleasanton/201264-000000/03 Reports and Studies/02 Deliverables/Water System Management Plan/Water_System_Management_Plan <br />Contents <br />SECTION 1 BACKGROUND AND PURPOSE OF THE WATER SYSTEM MANAGEMENT <br />PLAN 1 <br />1.1 Purpose of the WSMP 1 <br />1.1.1 Initial WSMP 1 <br />1.1.2 Future WSMP Updates 1 <br />1.2 WSMP Updates 2 <br />1.3 Existing Water Distribution System 2 <br />1.3.1 Water Supply Facilities 4 <br />1.3.2 Water Distribution Pipelines 4 <br />1.3.3 Water Booster Stations 4 <br />1.3.4 Water Storage Tanks 5 <br />SECTION 2 WATER SYSTEM PROGRAM EVALUATIONS AS PART OF THE WSMP 5 <br />SECTION 3 WATER SYSTEM PROGRAM EVALUATIONS OUTSIDE OF THE WSMP 7 <br />SECTION 4 FUTURE EVALUATION EFFORTS 8 <br />SECTION 5 LONG-TERM CAPITAL IMPROVEMENT PROGRAM 8 <br />5.1 Project Prioritization 9 <br />5.2 Priority A Project Descriptions 9 <br />5.2.1 Water Supply Projects 9 <br />5.2.2 Distribution System Capacity Projects 10 <br />5.2.3 Distribution System Fire Flow Projects 11 <br />5.2.4 Rehabilitation and Replacement Projects 11 <br />5.2.5 Other Projects 12 <br />5.3 Priority B Project Descriptions 12 <br />5.3.1 Distribution System Fire Flow Projects 12 <br />5.3.2 Rehabilitation and Replacement Projects 12 <br />5.3.3 Other Projects 13 <br />5.4 Priority C Project Descriptions 13 <br />5.4.1 Water Supply Projects 13 <br />5.4.2 Distribution Projects 13 <br />5.4.3 Rehabilitation and Replacement Projects 13 <br />SECTION 6 COST ESTIMATING ASSUMPTIONS 14 <br />6.1 Planning Level Costs and Markups 14 <br />SECTION 7 LONG TERM CIP COSTS 15 <br />7.1 Long Term CIP Summary 15 <br />SECTION 8 O&M PROGRAM IMPROVEMENTS 17 <br />Page 428 of 658
The URL can be used to link to this page
Your browser does not support the video tag.