Laserfiche WebLink
WATER SYSTEM MANAGEMENT PLAN OCTOBER 2024 / CAROLLO <br />CITY OF PLEASANTON WATER SYSTEM MANAGEMENT PLAN i <br />pw://Carollo/CA/Pleasanton/201264-000000/03 Reports and Studies/02 Deliverables/Water System Management Plan/Water_System_Management_Plan <br />Contents <br />SECTION 1 BACKGROUND AND PURPOSE OF THE WATER SYSTEM MANAGEMENT <br />PLAN 1 <br />1.1 Purpose of the WSMP 1 <br />1.1.1 Initial WSMP 1 <br />1.1.2 Future WSMP Updates 1 <br />1.2 WSMP Updates 2 <br />1.3 Existing Water Distribution System 2 <br />1.3.1 Water Supply Facilities 4 <br />1.3.2 Water Distribution Pipelines 4 <br />1.3.3 Water Booster Stations 4 <br />1.3.4 Water Storage Tanks 5 <br />SECTION 2 WATER SYSTEM PROGRAM EVALUATIONS AS PART OF THE WSMP 5 <br />SECTION 3 WATER SYSTEM PROGRAM EVALUATIONS OUTSIDE OF THE WSMP 7 <br />SECTION 4 FUTURE EVALUATION EFFORTS 8 <br />SECTION 5 LONG-TERM CAPITAL IMPROVEMENT PROGRAM 8 <br />5.1 Project Prioritization 9 <br />5.2 Priority A Project Descriptions 9 <br />5.2.1 Water Supply Projects 9 <br />5.2.2 Distribution System Capacity Projects 10 <br />5.2.3 Distribution System Fire Flow Projects 11 <br />5.2.4 Rehabilitation and Replacement Projects 11 <br />5.2.5 Other Projects 12 <br />5.3 Priority B Project Descriptions 12 <br />5.3.1 Distribution System Fire Flow Projects 12 <br />5.3.2 Rehabilitation and Replacement Projects 12 <br />5.3.3 Other Projects 13 <br />5.4 Priority C Project Descriptions 13 <br />5.4.1 Water Supply Projects 13 <br />5.4.2 Distribution Projects 13 <br />5.4.3 Rehabilitation and Replacement Projects 13 <br />SECTION 6 COST ESTIMATING ASSUMPTIONS 14 <br />6.1 Planning Level Costs and Markups 14 <br />SECTION 7 LONG TERM CIP COSTS 15 <br />7.1 Long Term CIP Summary 15 <br />SECTION 8 O&M PROGRAM IMPROVEMENTS 17 <br />Page 428 of 658