Laserfiche WebLink
EXHIBIT A <br />s <br />@ SANDIS tmBRYANT <br />STANDARD HOURLY CHARGE RATES <br />Enforced: May 1, 2023 through June 30, 2024 <br />ENGINEERING SERVICES/QSD&QSP SERVICES <br />Project Specialist/Clerical 105.00 <br />Computer/Field/Engineer Technician Level 1 $105.00 <br />Level II $115.00 <br />Level III $130.00 <br />Sr. Engineer Technician 135.00 <br />Design Engineer Level 1 $125.00 <br />Level 11 $130.00 <br />Level III $135.00 <br />Project Engineer/Traffic Engineer Level 1 $150.00 <br />Level II $170.00 <br />Level III $180.00 <br />Senior Engineer Level 1 205.00 <br />Engineering Project Manager Level 1 215.00 <br />Engineering Project Manager Level 2 250.00 <br />Associate Principal/Sr. Project Manager/Sr. Traffic Engineer 265.00 <br />Principal 325.00 <br />Forensic Review/Analysis/Claim Support 500.00 <br />SURVEYING SERVICES/HIGH DEFINITION SCANNING/3-D MODELING SERVICES <br />Computer/Surveying/Scanning Technician Level 1 $105.00 <br />Level 11 $115.00 <br />Level III $125.00 <br />Project Surveyor/Scanning Specialist Level 1 $135.00 <br />Level II $145.00 <br />Level 111 $175.00 <br />Survey Project Manager Level 1 215.00 <br />Survey Project Manager Level 2 250.00 <br />Senior Field Survey Supervisor/AISC/Manager 300.00 <br />Utility Locating Services 1-Person Crew 175.00 <br />Utility Locating Services 2-Person Crew 290.00 <br />Utility Locating Manager 165.00 <br />1-Person Survey Crew 200.00 <br />2-Person Survey Crew 350.00 <br />2-Person Survey Crew with Apprentice 450.00 <br />3-Person Survey Crew 500.00 <br />Union Field Surveyor Official Travel 75.00 <br />INCLUSION TO RATES:Above rates include all applicable fringe,overhead and profit calculations.No additional percentages for <br />overhead,profit,or any other costs related to labor will be charged.Rates are current for Fiscal Year 2023-24(7/1/2023-6/30/2024). <br />The City will consider annual adjustments based on CPI(Consumer Price Index,May of applicable years)and submitted prior to the end <br />of the fiscal year for approval based on ENR Construction Index for San Francisco and Bay Area <br />Field Services: Field service rates are inclusive of mileage and equipment charges. <br />BUILD ON. 1 <br />Docusign Envelope ID: 5D3CCE19-B708-80B8-82CF-86F56E0B2B92