My WebLink
|
Help
|
About
|
Sign Out
CORE & MAIN LP (#2027021)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
C
>
CORE & MAIN LP (#2027021)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2026 3:47:47 PM
Creation date
8/21/2026 3:44:04 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
Goods and Services
Contract Type
New
NAME
CORE & MAIN LP
Contract Record Series
704-05
Munis Contract #
2027021
Contract Expiration
6/30/2024
NOTES
WATER METER REPLACEMENT & AMI SYSTEM PROJECT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFP-2 – Scope of Work <br />RFP# PWD 25.604 City of Pleasanton, CA RFP-2 | Page 7 <br />Internal Use Only <br />E.Approvals for work. <br />F.Change orders. <br />Each AR Form shall include at a minimum the following: <br />G.Unique identifying number for document reference. <br />H.Date of submission, previous submission history and date of approval. <br />I.Project name and reference number. <br />J.Name and signature of the Contractor’s Project Manager. <br />K.Description of work the Contractor is requesting Acceptance on. <br />L.Supporting documents as may be required by the City. <br />M.Description of approval / corrective action required. <br />The City shall review all submitted AR Forms within fifteen (15) business days of receipt and provide one of the <br />following responses: <br />N.Acceptance Approval: The City accepts the Work detailed. <br />O.Conditional Approval: The City accepts the Work detailed, but the City has provided some additional <br />actions the Contractor shall perform to complete the Work. Conditional Approval may or may not hold up <br />payment. <br />P.Acceptance Not Approved. The City rejects the Contractor’s request for acceptance. This will not allow <br />the Contractor to proceed to invoice for the work detailed on the AR Form. <br />1.3.Integration and Testing Process <br />1.3.1.System Architecture Diagram <br />The Contractor shall develop a system architecture diagram that includes all proposed systems and interfaces <br />that connect to the existing City systems. <br />1.3.2.Interface Development Steps <br />The Contractor and the City shall work together through the following steps for each proposed interface: <br />A.Business Requirement Gathering Meetings: The Contractor shall develop and lead a series of business <br />requirements gathering sessions that will identify the required scope and any functional alternatives <br />that may be available. The Contractor shall document the outcomes and decisions that will allow the <br />development of the Functional Design Document. <br />B.Functional Design Document (FDD): The Contractor and the City shall document all fields of data that <br />will be passed between systems, how data will be passed, the frequency with which it will be passed, <br />detail the list of acceptable values of each system, detail any data validations performed prior to or <br />during data transfer, and define any conditions and triggers that will initiate an action through the <br />interface. The FDD must include field-level mapping, data validation rules, error handling procedures, <br />and security requirements (e.g. encryption standards for data in transit and at rest). The FDD document <br />for each interface shall be signed off on by all parties (including City IT), agreeing that the documents <br />represent the required functionality for the specific business function. It is expected that the FDD <br />process will go through numerous reviews and a minimum of three (3) weeks of testing. <br />C.Interface Development: The Contractor and the City shall develop their respective sides of all interfaces <br />based on the required details in the approved FDD document. It is expected the interface development <br />step shall take six (6) weeks from the approved FDD document. <br />Docusign Envelope ID: 6AD75F50-8A33-85A5-8039-9E3E1257A838Docusign Envelope ID: 177582DA-4F1C-8834-813C-BC4FD03AA45E
The URL can be used to link to this page
Your browser does not support the video tag.