Laserfiche WebLink
Todd Yamello <br />May 26, 2026 <br />Page 8 <br /> <br /> <br /> <br />Server Relocation (Task 4) and OT System Monitoring Implementation (Task 6) to confirm that <br />the implementation of these projects are consistent with the Basis of Design, operational <br />continuity needs, cybersecurity objectives, and SCADA resilience goals. Support may include <br />participation in coordination meetings; review of relocation concepts, implementation plans, <br />vendor materials and proposals, equipment selections, proposed architectures, network and <br />virtualization approaches, backup and recovery strategies, integration approaches, <br />testing/cutover procedures, and procurement-related technical information; and <br />recommendations related to OT asset visibility, vulnerability management, threat detection, log <br />aggregation, alerting, forensic capability, and IT security integration. <br />• On-Call SCADA Integration RFQ Development – West Yost will support the City in developing an <br />RFQ to establish a pool of qualified SCADA system integrators for on-call services. This includes <br />preparing the RFQ, defining evaluation criteria, reviewing submittals, and supporting the City <br />through the selection process. <br />Task 7 Assumptions <br />• West Yost will perform additional, as-needed services up the amount allocated to this task only after <br />receiving a request and written authorization from the City. <br />• West Yost will provide a separate estimate for each request on a time-and-materials basis up to the <br />level of effort shown in Table 1. <br /> <br />Task 7 Deliverables <br />• Deliverables are TBD based on services requested by the City. <br /> <br />Docusign Envelope ID: C46F6467-48FC-8755-8247-09E863327CA7Docusign Envelope ID: A1F306CD-3D85-8219-8045-1E730ABF3862