Laserfiche WebLink
Todd Yamello <br />May 26, 2026 <br />Page 7 <br /> <br /> <br /> <br />• The cost estimate will be developed for budgeting purposes and will not represent a final <br />construction or procurement estimate. <br /> <br />Task 5 Deliverables <br />• Basis of Design memorandum for P1-3 Remote Access Improvements. <br />• Planning-level (AACE Class 5) opinion of probable cost. <br />• High-level project schedule framework. <br />Task 6. OT System Monitoring Implementation Basis of Design and Cost Estimate <br />The objective of this task is to investigate and define the scope, level of effort, and planning-level cost <br />required to implement Project P1-4 – OT System Monitoring Implementation. This task will not include <br />procurement or deployment of monitoring tools, but will establish the technical framework, functional <br />requirements, and budget necessary for future execution. Work activities under this task include: <br />• OT System Monitoring Basis of Design – West Yost will review existing SCADA/OT monitoring <br />tools, logging, cybersecurity, alerting, and related IT/Utilities workflows; define functional <br />requirements for OT asset visibility, vulnerability management, threat detection, log <br />aggregation, forensic analysis, and IT security integration; evaluate potential OT monitoring <br />solutions; and develop a phased implementation and operational strategy. The work will <br />culminate in an OT System Monitoring Basis of Design documenting the recommended <br />monitoring approach, key requirements, implementation plan, and ongoing support model. <br />• Planning-Level Cost Estimate Development – West Yost will prepare a planning-level cost <br />estimate consistent with an AACE Class 5 estimate. The estimate will include anticipated <br />software licensing, hardware appliances (if required), configuration services, integration <br />support, training, and contingency. <br />Task 6 Assumptions <br />• This task is limited to development of a Basis of Design and planning-level cost estimate and does <br />not include procurement, configuration, or deployment of monitoring systems. <br />• The City will provide documentation of existing monitoring tools and network architecture. <br />• The cost estimate will be prepared for budgeting purposes only and will not represent a final <br />implementation estimate. <br /> <br />Task 6 Deliverables <br />• Basis of Design memorandum for P1-4 OT System Monitoring Implementation. <br />• Planning-level (AACE Class 5) opinion of probable cost. <br />Task 7. As-Needed Services <br />The objective of this task is to provide additional services related to the previous tasks as requested by <br />the City up to the budget amount shown in Table 1. Some potential additional services may include: <br />• As-Needed Owner’s Advisor/Technical Support – West Yost will provide as-needed owner’s <br />advisor/technical advisory support to City IT and Utilities staff with the Backup Core SCADA <br />Docusign Envelope ID: C46F6467-48FC-8755-8247-09E863327CA7Docusign Envelope ID: A1F306CD-3D85-8219-8045-1E730ABF3862