My WebLink
|
Help
|
About
|
Sign Out
KIER & WRIGHT (#2027114)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
K
>
KIER & WRIGHT (#2027114)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2026 10:31:26 AM
Creation date
8/25/2026 10:29:26 AM
Metadata
Fields
Template:
CONTRACTS
Description Type
Design Professionals
Contract Type
New
NAME
KIER & WRIGHT CIVIL ENGINEERS AND SURVEYORS, INC.
Contract Record Series
704-05
Munis Contract #
2027114
Contract Expiration
12/31/2027
NOTES
ROADWAY ALIGHMENT FOR EL CHARRO RD BETWEEN STONERIDGE & STANLEY BLVD.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Radius Design w illidentifydry uti lityand overhead power <br />line conflicts for each alternative. PG&E relocations <br />are k nown to carry mult i-year lead ti m es, a nd early <br />conflict ident ification is essential to keeping u t ilit y <br />re locat ion off the project's c ri t ical pat h. Radius Design <br />w ill also identify backbone dry utility infrastructure to <br />b e accommodat ed wit hin the rig ht -of-w ay for future <br />developm ent. <br />AR/WS w ill id entify affected parcels. c haracterize t he <br />type of r ig ht aw ay takes required. assess valuat ion <br />implications. and provide a planni n g -level acquisition <br />assessment addressing p ermane nt acquisi ti ons, <br />temporary easem ent s. and parcel access effects <br />across the corridor. <br />Deliverables: Utility. d ra inage. and right -of-w ay exhibit <br />ident ifying key conflicts. constraints. and right -of-w ay <br />n eeds for each a lig nment alternative. accompanied <br />by a memorandum summar iz ing findings and <br />recommendations. <br />TASK g -STAKEHOLDER AND AGENCY <br />COORDINATION <br />LEAD FIRM: K .. W <br />CONTRIBUTING: ALL SUBCONSULTANTS <br />K+W will lead stakeholder and agency coordination <br />as d irected by t he Ci ty. prepari ng meeting materi als <br />and documenting comments and responses at each <br />step. Where specific technical expertise is n eed ed <br />to support a particular stakeh older conve rsa t ion, the <br />re levant su bconsultant wi ll b e b rought in as n eeded. <br />The El C harro corridor involves an unusually broad <br />set of stakeh olders. Key parties anticipated t o requi re <br />coordinatio n in c lude q uarry operat ors regardi ng <br />access and t ruck traffic: Zone 7 Water Agency regarding <br />infrastructure . lake management. and groundwater <br />aquifer protection: t he Cit y o f Livermore as a n adjacent <br />j urisdiction: the Ci ty of Dublin given proximity and <br />potent ial t raffic implications: t he Livermore Amador <br />Va lley Transit Aut h ority regardi ng BRT considerat ions: <br />East Bay Regional Pa rk District given t h e Shadow Cliffs <br />connection at Stanley Boulevard: Caltrans d epending <br />on study area limits: Union Pacific Ra ilroad regarding <br />t he crossing: and privat e landow ners wit h active <br />e nt itlements o r development applicat ions w here <br />alignment decisions could affec t access o r right -of- <br />w ay. Immediate neighborh ood out reach is antici p ated <br />to be addressed t hrough the Ci ty o f Pleasanton's <br />existing public engagement processes. <br />Deliverables: Meeting m aterials. action it e m and <br />decision logs. an d agency and stakeholder coordi nat ion <br />documentat ion. A minimum of three one-hour <br />meetings w ith each key stakeho lder is anticipat ed. w ith <br />t h e appropriate subconsu ltant participating as needed <br />based on t he su bject matter of each meeting. <br />TASK 10 -PREFERRED ALIGNMENT <br />RECOMMENDATION AND FINAL <br />DOCUMENTATION <br />LEAD FIRM: K .. W <br />CONTRIBUTING: TJKM, GREEN DESIGN, AR/WS <br />K+W wi ll recomme n d a p referred p recise roadway <br />alignment based on t he result s of t he alternatives <br />analysis an d Ci t y feedback. synt hesizing t he w ork <br />p roducts from Tasks 1 t hrough g. K+W. in conjunction <br />wit h TJ KIV! and Green Design. w ill prepare d raft <br />and fi na l technica l documentation. exh ib its. typical <br />section s. and presentation materi als for city rev iew. <br />The documentation w ill include a clear an d technica lly <br />defensible narrative t h at ex plains w hy the p refe rred <br />alignment is recommended and w hat t h e city shou ld <br />expect in t h e next p hase of project delivery. <br />Upon selection of t h e preferred alignme nt. K+W will <br />p repare a p lat map and legal description of the area to <br />be reserved for the f uture roa dway, as w e ll as separate <br />plat maps and leg al descript ions for each affected <br />parcel through which the alignment extends. suit able <br />for recordatio n against t he p ropert y as required by <br />t h e RFP. AR/WS wi ll support thi s e ffort by confirming <br />parce l ownership, boundary conditio n s. and any t itle <br />con siderations re levant to the legal d escri p tio ns. <br />Deliverables: Dra ft and fi nal p referred a lignment <br />package in cludi n g conceptual p la n and profi le draw ings. <br />typical sections wit h concept ua l landscape t reatments. <br />design assumptions and constraints summary. o rder- <br />of-magnitude cost est imates. a nd recomm end ed next <br />steps: final prec ise roadway alignment report plat maps <br />and legal descriptions for t h e prefer red alignment <br />corridor and each affected parce l: and presentat ion <br />materi als and editable e lectronic files for Ci ty revi ew. <br />Kier ,. Wright I Page 17 <br />Docusign Envelope ID: 776668AA-84FE-8E4D-81ED-F89B854166B8Docusign Envelope ID: 1E4E4FCF-7AB2-8687-82B4-D0B680FDBFDB
The URL can be used to link to this page
Your browser does not support the video tag.