Page 3 of 4 <br />TASK 9 - STAKEHOLDER AND AGENCY COORDINATION $51,373 <br />TASK 10 - PREFERRED ALIGNMENT RECOMMENDATION AND <br />FINAL DOCUMENTATION <br />$117,247 <br />SUBCONSULTANT MANAGEMENT $62,863 <br />Subtotal $881,344 <br />5% reimbursable $44,067 <br />TOTAL $925,411 <br /> <br />Kier and Wright’s references have been checked and are in good standing, having completed <br />similar projects in Pleasanton, Tracy, and Livermore. <br /> <br />Schedule <br />The proposal outlines a 12-month timeline to reach the final precise roadway alignment. <br /> <br />Table 2. Proposed Schedule <br />June-2026 to July-2026 Project initiation and data collection <br />Aug-2026 to Nov-2026 Alignment Alternatives Development/constraints/permits <br />Aug-2026 to Dec-2026 Stakeholder & Agency Coordination <br />Jan-2027 to May-2027 Preferred Alignment & Final Documentation <br />June-2027 Project complete and ready for detailed design <br /> <br />EQUITY AND SUSTAINABILITY <br />The proposal advances equity by incorporating ADA, pedestrian, bicycle, and transit, <br />evaluating right-of-way and access impacts early in the El Charro alignment study process, <br />and structuring broad stakeholder coordination. It advances sustainability through multimodal <br />corridor planning, long-range design criteria, comprehensive environmental screening, low- <br />impact development stormwater planning, floodplain/hydraulic analysis, and early utility <br />planning to reduce future retrofits. <br /> <br />OUTREACH <br />Docusign Envelope ID: 1E4E4FCF-7AB2-8687-82B4-D0B680FDBFDB