My WebLink
|
Help
|
About
|
Sign Out
COUNCIL AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
050625 REGULAR
>
COUNCIL AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2026 4:21:10 PM
Creation date
8/26/2026 4:17:35 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/6/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 5 <br />equipment in anticipation of the street resurfacing and slurry seal projects. <br /> <br />Bids <br />Sealed bids for this project were opened on April 7, 2025. A total of five bids were received, <br />ranging from $293, 007 to $393,474, compared with the Engineer’s Estimate of approximately <br />$360,000 (see Attachment 3). The responsible lowest bid was received from Sierra Nevada <br />Construction, Inc., of Sparks, Nevada, in the amount of $293, 007, which is approximately 22 <br />percent lower than the Engineer’s Estimate. Staff reviewed the lowest bidder’s bid prices and <br />deemed them to be reasonable and acceptable. The work performed by Sierra Nevada <br />Construction, Inc., for other agencies was verified to be satisfactory. Staff recommends the <br />City Council award the construction Sierra Nevada Construction, Inc. <br /> <br />Schedule <br />The work will begin in September 2025 after the completion of the preparatory base repair and <br />crack sealing work that is included in the upcoming Annual Streets Resurfacing & <br />Reconstruction Project, which is anticipated to start construction in June 2025. The September <br />start will also ensure that the material is being placed during the most ideal temperature <br />conditions. <br /> <br />The proposed schedule for the project is: <br />Approval of Plans & Specifications and Award of Contract: May 6, 2025 <br />Start of Construction: September 2025 <br />End of Construction: October 2025 <br /> <br />EQUITY AND SUSTAINABILITY <br />Ensuring quality streets benefits all communities in Pleasanton, as the roadways are a public <br />resource used by all members of the Pleasanton community. <br /> <br />OUTREACH <br />Construction notices, social media posts, and information will be posted on the City’s website <br />prior to the start of construction. The contractor will also hand deliver construction notices to <br />businesses and residents where the project will occur. <br /> <br />STRATEGIC PLAN ALIGNMENT <br />Approval of this action advances the Citywide ONE Pleasanton strategic plan goal of Investing <br />in Our Environment, Strategy 1 – Implement the four-year Capital Improvement Program (CIP) <br />to complete design and construction of budgeted capital projects. <br /> <br />FISCAL IMPACT <br />A total of $785,000 is budgeted for the Annual Slurry Sealing of Various Streets Project, CIP <br />No. 25504, in the FY 24-25 Capital Improvement Program. The anticipated total expenditure <br />for this project is $356,093, including a project contingency of $29,301 (approximately 10 <br />percent of the bid amount). The contingency is for unforeseen yet necessary related work. The <br />budget includes an advertising cost, $15,000 for tree trimming and $18,000 for material testing <br />services under on-call contracts. The funding and anticipated project expenditures are also <br />provided in Attachment 2. <br /> <br />The anticipated total expenditure of $356,093 leaves a project balance of $428,907. Staff <br />Page 128 of 249
The URL can be used to link to this page
Your browser does not support the video tag.