Laserfiche WebLink
5298389.1 <br />to implementation and, where required under this Agreement or applicable <br />law, shall obtain City’s prior written approval. <br />The foregoing is intended to reflect the City’s role as project partner and <br />owner of the City Sites. Nothing in this Agreement shall be construed to <br />waive, limit, or supersede any applicable zoning, planning, building, land- <br />use, or other regulatory requirements or any permit or approval required by <br />City or another governmental agency having jurisdiction over the Project. <br />Conversely, any contractual review or approval rights expressly provided <br />to City under this Agreement are separate from and in addition to any <br />regulatory permits or approvals required by applicable law. <br />For design and construction reviews, City shall have fourteen (14) days <br />from delivery of the applicable design, proposal, schedule, or other <br />materials to provide written comments in exception to 65% design and at <br />the 100% design milestone. Zone 7 shall provide such materials sufficiently <br />in advance of the proposed adoption or implementation date to allow City a <br />full fourteen (14)-day review period. City shall provide consolidated written <br />comments within such fourteen (14)-day period. <br />Zone 7 shall seek City’s agreement on Project components such as <br />aesthetics, location, and noise associated with well housing facilities located <br />on City owned property, and Zone 7 shall seek City’s approval prior to <br />approval of the 65% detail design and at the 100% design milestone. Zone <br />7 shall dedicate a minimum of 45 workdays from the submittal date for <br />community outreach and governing body approval. <br />Zone 7 and City shall work in good faith to resolve material disagreements <br />concerning City comments, and Zone 7 shall not proceed with a disputed <br />design or construction element that would materially affect City Sites, park <br />operations, public access, or park users until the applicable issue has been <br />resolved. <br />4.6.3 Contracting Party. Zone 7 shall have sole authority and responsibility for <br />entering into a contract(s) with consultants/professionals/contractors to <br />perform services related to Project design and construction phases. <br />4.6.4 Basis of Design. The Project’s design shall be based on the specifications <br />outlined and discussed in that certain Regional Groundwater Facilities <br />Project Feasibility Study, authored December 2025 by consultant LSCE, <br />including Appendix J - Basis of Design Report (BODR). <br />4.6.5 Retention of Project Professionals and Contractors. Zone 7 shall develop a <br />request(s) for proposal for the PDB for the Project (“RFPs”) and provide to <br />the City for review prior to release and shall consider City’s comments. <br />Zone 7 shall be solely responsible for the solicitation of bids/responses to <br />the RFPs. Upon receipt of proposals/qualification/bids (“Bids”) in response <br />Page 277 of 344