My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET 9-1-26
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
090126 REGULAR
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET 9-1-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2026 2:46:40 PM
Creation date
8/27/2026 2:41:53 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/1/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5298389.1 <br />to the RFPs, Zone 7 shall provide Bids to the City for review and shall <br />consider City comments and feedback in Zone 7’s selection of winning bids. <br />For RFPs and Bids, the City shall have seven (7) days from delivery to City <br />to provide comments to Zone 7. <br />4.6.6 Design Performance Criteria. The Project shall be designed with the <br />objective to achieve the following production capacity benchmarks. <br />(a) Wells Production Capacity <br />Basin Condition Production Capacity Tennis Park Hansen Park Total <br />Facility Flow Rate (MGD) 4.9 4.9 9.8 Drought Years <br />Annual Production (AFY) 4,100 4,100 8,200 <br />Facility Flow Rate (MGD) 6.1 5.5 11.6 Average Years <br />Annual Production (AFY) 5,100 4,600 9,700 <br />Facility Flow Rate (MGD) 7.3 6.1 13.4 Wet Years <br />Annual Production (AFY) 6,200 5,100 11,300 <br />Notes: <br />Annual production capacity assumes a 75% run time consistent with Zone 7 reliability goals. <br /> <br />(b) Hopyard Production Capacity <br />Basin <br />Condition <br />Production <br />Capacity <br />New <br />Joint <br />Wells <br />Zone 7 <br />Hopyard 6 <br />Well <br />Zone 7 <br />Hopyard 9 <br />Well <br />Total <br />All Wells <br />Facility Flow Rate <br />(MGD) <br />9.8 4.9 1.3 16 Drought <br />Years <br />Annual Production <br />(AFY) <br />8,200 4,100 1,100 13,400 <br />Facility Flow Rate <br />(MGD) <br />11.6 5.4 1.4 18.4 Average <br />Years <br />Annual Production <br />(AFY) <br />9,700 4,500 1,200 15,400 <br /> <br />Facility Flow Rate <br />(MGD) <br />13.4 5.8 1.6 20.8 Wet Years <br />Annual Production <br />(AFY) <br />11,300 4,900 1,300 17,500 <br />Notes: <br />Annual production capacity assumes a 75% run time consistent with Zone 7 reliability goals. <br /> <br />4.6.7 Guaranteed Capacity Allocation. The City shall be entitled to a minimum <br />annual Groundwater Supply from the Project of 3,500 acre-feet per year <br />(AFY), produced and delivered at a maximum daily volume of 6.2 million <br />gallons per day (MGD). <br />Page 278 of 344
The URL can be used to link to this page
Your browser does not support the video tag.