5298389.1 <br />6.4.4 Measurement of Water. In order to ascertain the correct cost allocation, <br />water shall be measured as follows: (a) at turnouts: the total volume <br />measured at all City turnouts equals the total volume supplied to City for <br />both its GPQ and water supplied under the Supply Contract; as GPQ and <br />Supply Contract water are a combined delivery that cannot be separately <br />metered, it will be assumed that the volume of water included in City’s GPQ <br />delivery schedule equals the volume of GPQ supplied and that all excess <br />volume is Supply Contract water; (b) at the Wells: the total volume <br />measured from Wells equals the total volume of pumped groundwater; <br />City’s GPQ volume versus this total volume of pumped groundwater equals <br />City’s proportional share factor for Well and Pipeline O&M costs; (c) at the <br />Hopyard: the total volume measured from the effluent of the Hopyard <br />equals the total volume of treated groundwater (including from non-Project <br />wells); City’s GPQ volume versus this total volume equals City’s <br />proportional share factor for Hopyard O&M costs. <br />6.4.5 Billing and Payment. <br />(a) Estimated Costs. Annually, on or before October 15, Zone 7 shall <br />provide City a provisional GPQ cost rate for the following calendar <br />year based on budgeted costs and projected cost share proportions. <br />(b) Monthly Billing. Zone 7 shall invoice City monthly for actually <br />delivered GPQ. City shall remit payment in full within thirty (30) <br />days from the invoice date. After thirty (30) days, the invoice will <br />accrue interest at a rate of ten percent (10 %) per annum. <br />(c) Annual True Up. Zone 7 will reconcile the provisional cost rate vs. <br />the audited actual cost rate at the conclusion of each calendar year <br />to account for variances between projected and actual costs and cost <br />share proportions. Differences will be credited or debited on the next <br />monthly billing. Zone 7 shall provide reasonable supporting <br />documentation sufficient for the City to verify the annual true up, <br />including the audited actual cost rate, cost share calculations, and <br />explanation of material variances. Upon reasonable written request, <br />the City may review records directly related to the calculation of the <br />annual true up and may dispute any portion within 60 days after <br />receipt of supporting documentation, and the parties shall meet and <br />confer in good faith to resolve the dispute as provided in Section 7 <br />of this Agreement. <br />6.5 Repair, Replacement, and Enhancement. The Parties understand and agree that <br />the Project facilities may, and likely will, require repair, replacement, and/or enhancement over <br />time to address aging equipment or meet changing regulations. Such future capital improvement <br />activities exceed the scope and cost magnitude of typical maintenance and may require <br />studies/assessments, environmental documentation, design, and construction services to <br />implement (“Capital Improvements”). Zone 7 shall be solely responsible for identifying, <br />Page 282 of 344