Laserfiche WebLink
5298389.1 <br />6.3.4 Zone 7 Delivery Obligations. Zone 7 shall utilize commercially reasonable <br />efforts to deliver City’s GPQ per the delivery schedule. Delivered water <br />shall be of a quality that complies with the requirements for Drinking Water <br />of the California State Water Resources Control Board’s Division of <br />Drinking Water and the United States Environmental Protection Agency. <br />Unless otherwise agreed to in writing by the Parties, and to the extent <br />consistent with the terms of this Agreement, which shall govern in the event <br />of any inconsistency, the Supply Contract shall govern delivery of Project <br />water and any other terms related to Project operations not included in this <br />Agreement. <br />6.3.5 No Exclusivity. City reserves the right, at its sole discretion, to satisfy its <br />annual GPQ, in whole or in part, using sources external to the Project. The <br />exercise of this right shall not constitute a breach of this Agreement or result <br />in any penalties, surcharges, or reductions in City’s entitlements hereunder. <br />Zone 7 may likewise operate other water supply facilities and use other <br />water sources, including treated surface water, to meet and deliver City’s <br />GPQ. <br />6.3.6 Requests for Increase in Groundwater Proportion of Supply. Zone 7 <br />acknowledges that during certain times of the year City may request an <br />increased proportion of groundwater in deliveries to the City’s turnouts to <br />support water quality management within the City’s distribution system. <br />During such periods, Zone 7 shall use all reasonable efforts to accommodate <br />City’s requested groundwater blend, to the extent feasible and consistent <br />with Zone 7’s overall system operational needs, SGMA and other <br />regulatory requirements, and any other applicable operational constraints as <br />determined by Zone 7. <br />6.4 Cost Sharing. <br />6.4.1 Cost Allocation and Calculation. The Parties shall share annual O&M costs <br />on a pro rata basis based on pumped GPQ. The following elements shall <br />serve as the basis for O&M costs: (a) Wells and Pipelines: labor, <br />material/supplies, and power costs; (b) Hopyard: labor, chemicals, <br />material/supplies, and power costs. <br />6.4.2 Cost Adjustments. In the event Project facilities are unable to satisfy City’s <br />GPQ delivery amount in full and Zone 7’s other facilities are used to deliver <br />a portion of City’s GPQ, the approximated unit cost of water production for <br />the Project facilities will be used in lieu of the actual cost of production or <br />conveyance from Zone 7’s other facilities. <br />6.4.3 Annual True Up. In the event costs are billed and later discovered to differ <br />from those Zone 7 actually incurred to deliver City’s GPQ, Zone 7 shall <br />annually adjust for said billing disparities as described in section 6.4.5, <br />subdivision (c) of this agreement. <br />Page 281 of 344