Laserfiche WebLink
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. <br />, <br />Form SP 31 51 12 23 Page 2 of 2 <br />© 2023, The Hartford <br />(May include copyrighted material of Insurance Services Office, Inc., with its permission) <br />or dry rot,then our payment under the Business Income and Extra Expense Coverage Extensions is limited to <br />the amount of loss and expense sustained in a period of not more than 30 days unless another number of <br />days is indicated in the Declarations. The days need not be consecutive. <br />(b)If a covered suspension of "operations"was caused by loss or damage other than "fungi",wet rot or dry rot, <br />but remediation of "fungi",wet rot or dry rot prolongs the "period of restoration",we will pay for loss and <br />expense sustained during the delay (regardless of when such a delay occurs during the "period of <br />restoration"),but such coverage is limited to 30 days unless another number of days is indicated in the <br />Declarations. The days need not be consecutive. <br />B.The following changes are made to Section G., PROPERTY DEFINITIONS: <br />1.The following definition is added: <br />“Equipment breakdown accident”means a fortuitous event that causes direct physical loss or direct physical <br />damage to “equipment breakdown property”. The event must be one of the following: <br />a.Mechanical breakdown, including rupture or bursting caused by centrifugal force. <br />b.Artificially generated electrical,magnetic or electromagnetic energy,including electric arcing,that damages, <br />disturbs or otherwise interferes with any electrical or electronic wire, device, appliance or network. <br />c.Explosion of steam boilers,steam piping,steam engines or steam turbines owned or leased by you,or <br />operated under your control. <br />d.Physical loss or physical damage to steam boilers,steam pipes,steam engines or steam turbines caused by <br />or resulting from any condition or event inside such boilers or equipment. <br />e.Physical loss or physical damage to hot water boilers or other water heating equipment caused by or resulting <br />from any condition or event inside such boilers or equipment. <br />2.The following definition is added: <br />“Equipment breakdown property”means Covered Property which,during normal usage,operates under vacuum <br />or pressure, other than the weight of contents, or that generates, transmits or utilizes energy. <br />The following is not “equipment breakdown property”: <br />a.Any structure, foundation, cabinet, compartment or air supported structure or building; <br />b.Any insulating or refractory material; <br />c.Any sewer piping,any underground vessels or piping,any piping forming a part of a sprinkler system,water <br />piping other than boiler feedwater piping,boiler condensate return piping,or water piping forming a part of a <br />refrigerating or air conditioning system; <br />d.Any dragline, excavation or construction equipment; <br />e.Any vehicle or any equipment mounted on a vehicle.As used here,vehicle means any machine or apparatus <br />that is used for transportation or moves under its own power.Vehicle includes,but is not limited to,car,truck, <br />bus,trailer,train,aircraft,watercraft,forklift,bulldozer,tractor or harvester.However,any property that is <br />stationary,permanently installed at a “scheduled premises”and that receives electrical power from an <br />external power source will not be considered a vehicle. <br />f.Any equipment manufactured by you for sale. <br />Docusign Envelope ID: 9DF92A24-B534-85BA-8088-342315DF1839