My WebLink
|
Help
|
About
|
Sign Out
RES 2026066
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2026
>
RES 2026066
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2026 1:58:21 PM
Creation date
9/9/2026 1:36:27 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
9/1/2026
DESTRUCT DATE
15Y
DOCUMENT NO
2026-066
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARROYO LAGO RESIDENTIAL PROJECT <br />ADDENDUM <br /> <br /> <br />FCS 105 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480036/Addendum/21480036 Arroyo Lago Residential Project Addendum.docx <br />electricity and natural gas consumption as compared to the County Project. According to the Energy <br />Element of the General Plan, the City’s estimated energy demand for 2025 is 854.8 million kWh, <br />while estimated natural gas demand for 2025 is 25.8 million therms, or 2.6 billion kBTU. As described <br />above, the County Project was projected to generate approximately 1,729,121 kWh of electricity and <br />8,967,053 kBTU of natural gas. As such, the energy consumption calculated for the County Project <br />would constitute approximately 0.2 percent of the City’s estimated energy demand in 2025, and the <br />natural gas consumption calculated for the County Project would constitute approximately 0.3 percent <br />of the City’s estimated natural gas demand for 2025. As such, the County Project’s projected energy <br />and natural gas consumption would represent a negligible contribution to overall City demand and is <br />not expected to result in a substantial or adverse impact on regional energy or natural gas supplies. <br />In addition, City Municipal Code Chapter 20.08 adopts by reference the then-current edition of the <br />California Code of Regulations Title 24 Parts 1 through 12, which includes Part 6 (Energy Code) <br />standards for residential buildings and Part 11 (CALGreen Standards). Similar to the County Project, <br />the proposed project would be required to comply with applicable Title 24 standards, which would <br />help reduce the amount of energy required for lighting, water heating, and heating and air <br />conditioning in buildings and promote energy conservation. Compliance with these State and local <br />laws and regulations would ensure that building energy consumption under the proposed project <br />would not result in the use of energy in a wasteful, inefficient, or unnecessary manner. Operational <br />energy would also be consumed during vehicle trips associated with the proposed project. Fuel <br />consumption would be primarily related to vehicle use by residents and visitors associated with the <br />proposed project. Given the reduced scope of development contemplated by the proposed project, it <br />is reasonable to conclude that it would result in substantially similar, if not slightly reduced, VMT and <br />gasoline and diesel consumption as compared to the County Project. <br />The proposed project is located in an urbanized area that is well supported by public transit. Regional <br />and local access to the project site is provided via Busch Road, which is adjacent to the south of the <br />project site. Furthermore, LAVTA provides bus transit services through the Wheels bus service. <br />Wheels operates Routes 10R, 605, and 608 within 0.5 mile of the project site.30,31 However, Routes <br />605 and 608 provide only morning and afternoon school services._ The closest bus stops to the <br />project site are Martin Avenue and Mohr Avenue, and Stanley Boulevard and Valley Avenue, <br />approximately 0.3 mile northwest and 0.45 mile southwest of the project site, respectively. The ACE <br />Rail is a regional rail transit service that runs approximately 0.33 mile south of the project site and <br />provides connections throughout the County from San José to Stockton.32 The Pleasanton ACE Rail <br />station is located approximately 2.10 miles southwest of the project site at 4950 Pleasanton Avenue. <br />Finally, BART is a regional rail transit service that operates within the County and provides <br /> <br />30 Livermore-Amador Valley Transit Authority (LAVTA). 2025. Wheels System Map. Website: <br />https://www.wheelsbus.com/wp-content/uploads/2025/10/System-Map-Brochure-2025-CIRCA-production-MC2-WEB.pdf. <br />Accessed March 10, 2026. <br />31 Although certain transit stops are located within approximately 0.5 mile of the project site when measured as a <br />straight-line (“as-the-crow-flies”) distance, the actual pedestrian travel distance exceeds 0.5 mile due to the absence of <br />direct walking routes and the need to follow the existing street and path network. <br />32 ACE Rail. 2026. Schedules. Website: https://acerail.com/schedules/. Accessed March 10, 2026.
The URL can be used to link to this page
Your browser does not support the video tag.