Laserfiche WebLink
ARROYO LAGO RESIDENTIAL PROJECT <br /> ADDENDUM <br /> <br /> <br />104 FCS <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480036/Addendum/21480036 Arroyo Lago Residential Project Addendum.docx <br />design incorporates energy-efficient appliances, lighting, and building materials. Additionally, the <br />County Project would include pre-wiring for future conversion to all-electric systems. Further, <br />alternative transit options in the project vicinity would encourage the reduction of personal vehicle fuel <br />consumption. With respect to Alternative 2, energy use associated with construction and operation <br />would be reduced due to the elimination of off-site utility improvements, though the residential <br />component would remain unchanged. Direct energy impacts of Alternative 2 would be slightly less <br />than those of the County Project. Therefore, the Prior FEIR concluded that impacts would be less <br />than significant. (Draft EIR, pp. 3.5-13, 6-14). <br />Proposed Project Analysis and Conclusion <br />Construction <br />The proposed project would involve a similar construction duration and would result in similar, if not <br />slightly reduced, construction intensity as compared to the County Project, as it would reduce the <br />amount of proposed dwelling units and the scope and nature of off-site improvements. The proposed <br />project would also require substantially the same construction equipment and practices as the County <br />Project. It is reasonable to assume that the overall construction schedule and process would be <br />designed to be as efficient as commercially practicable to avoid excess monetary costs. This <br />assumption is consistent with established principles in construction and project management, which <br />emphasize schedule optimization and cost control through techniques such as critical path method <br />and resource allocation.28 For example, private development considerations such as coordination for <br />the use of equipment and fuel take into account efficiency opportunities due to the added expense <br />associated with inefficient, duplicative, and/or wasteful renting, maintaining, and fueling equipment. <br />Therefore, the opportunities for further future efficiency gains during construction are limited. <br />Accordingly, consistent with the impact conclusions of the Prior FEIR, it is anticipated that the <br />construction activities associated with the proposed project would not result in wasteful, inefficient, <br />and unnecessary consumption of energy. <br />Similar to the County Project, the proposed project would involve the use of construction lighting, field <br />services (office trailers), and electrically driven equipment such as pumps and other tools during <br />construction. However, similar to the conclusions of the Prior FEIR, the proposed project’s use of <br />such equipment would not be wasteful, as construction of the proposed project would be limited to the <br />permitted City hours of 8:00 a.m. to 5:00 p.m. Monday through Friday per the City’s Standard <br />Specifications and Details.29 Therefore, similar to the County Project and the impact conclusions of <br />the Prior FEIR, the proposed project would result in less than significant energy impacts related to <br />construction. <br />Operation <br />The proposed project would be substantially similar to the County Project, though with fewer <br />proposed dwelling units and a substantial reduction in the nature and scope of off-site improvements. <br />As such, it is likely that the proposed project would result in substantially similar, if not slightly less, <br /> <br />28 Daniel W. Halpin., & Bolivar A. Senior. (2010). Construction Management (4th edition). John Wiley & Sons. <br />29 This construction schedule is consistent with the air quality modeling.